Design & Construction Job Descriptions & Questions
What is Construction Cement Mason & Concrete Finisher Job Description ?
Job Description
Cement masons, concrete finishers, and terrazzo workers all work with concrete, one of the most common and durable materials used in construction. Once set, concretea mixture of Portland cement, sand, gravel, and waterbecomes the foundation for everything from decorative patios and floors to huge dams or miles of roadways.
Cement masons and concrete finishers place and finish concrete. They also may color concrete surfaces, expose aggregate (small stones) in walls and sidewalks, or fabricate concrete beams, columns, and panels. In preparing a site to place concrete, cement masons first set the forms for holding the concrete and properly align them. They then direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it. Masons then guide a straightedge back and forth across the top of the forms to screed, or level, the freshly placed concrete. Immediately after leveling the concrete, masons carefully float itsmooth the concrete surface with a bull float, a long-handled tool about 8 by 48 inches that covers the coarser materials in the concrete and brings a rich mixture of fine cement paste to the surface.
After the concrete has been leveled and floated, concrete finishers press an edger between the forms and the concrete and guide it along the edge and the surface. This produces slightly rounded edges and helps prevent chipping or cracking. Concrete finishers use a special tool called a groover to make joints or grooves at specific intervals that help control cracking. Next, they smooth the surface using either a powered or hand trowel, a small, smooth, rectangular metal tool.
Sometimes, cement masons perform all the steps of laying concrete, including the finishing. As the final step, they retrowel the concrete surface back and forth with powered or hand trowels to create a smooth finish. For a coarse, nonskid finish, masons brush the surface with a broom or stiff-bristled brush. For a pebble finish, they embed small gravel chips into the surface. They then wash any excess cement from the exposed chips with a mild acid solution. For color, they use colored premixed concrete. On concrete surfaces that will remain exposed after the forms are stripped, such as columns, ceilings, and wall panels, cement masons cut away high spots and loose concrete with hammer and chisel, fill any large indentations with a Portland cement paste, and smooth the surface with a carborundum stone. Finally, they coat the exposed area with a rich Portland cement mixture, using either a special tool or a coarse cloth to rub the concrete to a uniform finish.
Throughout the entire process, cement masons must monitor how the wind, heat, or cold affects the curing of the concrete. They must have a thorough knowledge of concrete characteristics so that, by using sight and touch, they can determine what is happening to the concrete and take measures to prevent defects.
Segmental pavers lay out, cut, and install paversflat pieces of masonry made from compacted concrete or brick. This masonry is typically installed in patios, sidewalks, plazas, streets, crosswalks, parking lots, and driveways. Installers usually begin their work on a previously prepared base that has been graded to the proper depth, although some projects may include the base preparation. A typical segmental paver installation begins with leveling a layer of sand, followed by placement of the pavers, normally by hand but sometimes by machine. Usually the work includes constructing edges to prevent horizontal movement of the pavers. Sand is then added to fill the joints between the pavers.
Terrazzo workers create attractive walkways, floors, patios, and panels by exposing marble chips and other fine aggregates on the surface of finished concrete. Much of the preliminary work of terrazzo workers is similar to that of cement masons. There are six different types of terrazzo, but the focus of this description is on the most common standard terrazzo: Marble-chip terrazzo, which requires three layers of materials. First, cement masons or terrazzo workers build a solid, level concrete foundation that is 3 to 4 inches deep. Second, after the forms are removed from the foundation, workers add a 1-inch layer of sandy concrete. Terrazzo workers partially embed, or attach with adhesive, metal divider strips in the concrete wherever there is to be a joint or change of color in the terrazzo. For the third and final layer, terrazzo workers blend and place into each of the panels a fine marble chip mixture that may be color-pigmented. While the mixture is still wet, workers add additional marble chips of various colors into each panel and roll a lightweight roller over the entire surface.
When the terrazzo is thoroughly set, helpers grind it with a terrazzo grinder, which is somewhat like a floor polisher, only much heavier. Any depressions left by the grinding are filled with a matching grout material and hand-troweled for a smooth, uniform surface. Terrazzo workers then clean, polish, and seal the dry surface for a lustrous finish.
Answer: 1
Job Description
Cement masons, concrete finishers, and terrazzo workers all work with concrete, one of the most common and durable materials used in construction. Once set, concretea mixture of Portland cement, sand, gravel, and waterbecomes the foundation for everything from decorative patios and floors to huge dams or miles of roadways.
Cement masons and concrete finishers place and finish concrete. They also may color concrete surfaces, expose aggregate (small stones) in walls and sidewalks, or fabricate concrete beams, columns, and panels. In preparing a site to place concrete, cement masons first set the forms for holding the concrete and properly align them. They then direct the casting of the concrete and supervise laborers who use shovels or special tools to spread it. Masons then guide a straightedge back and forth across the top of the forms to screed, or level, the freshly placed concrete. Immediately after leveling the concrete, masons carefully float itsmooth the concrete surface with a bull float, a long-handled tool about 8 by 48 inches that covers the coarser materials in the concrete and brings a rich mixture of fine cement paste to the surface.
After the concrete has been leveled and floated, concrete finishers press an edger between the forms and the concrete and guide it along the edge and the surface. This produces slightly rounded edges and helps prevent chipping or cracking. Concrete finishers use a special tool called a groover to make joints or grooves at specific intervals that help control cracking. Next, they smooth the surface using either a powered or hand trowel, a small, smooth, rectangular metal tool.
Sometimes, cement masons perform all the steps of laying concrete, including the finishing. As the final step, they retrowel the concrete surface back and forth with powered or hand trowels to create a smooth finish. For a coarse, nonskid finish, masons brush the surface with a broom or stiff-bristled brush. For a pebble finish, they embed small gravel chips into the surface. They then wash any excess cement from the exposed chips with a mild acid solution. For color, they use colored premixed concrete. On concrete surfaces that will remain exposed after the forms are stripped, such as columns, ceilings, and wall panels, cement masons cut away high spots and loose concrete with hammer and chisel, fill any large indentations with a Portland cement paste, and smooth the surface with a carborundum stone. Finally, they coat the exposed area with a rich Portland cement mixture, using either a special tool or a coarse cloth to rub the concrete to a uniform finish.
Throughout the entire process, cement masons must monitor how the wind, heat, or cold affects the curing of the concrete. They must have a thorough knowledge of concrete characteristics so that, by using sight and touch, they can determine what is happening to the concrete and take measures to prevent defects.
Segmental pavers lay out, cut, and install paversflat pieces of masonry made from compacted concrete or brick. This masonry is typically installed in patios, sidewalks, plazas, streets, crosswalks, parking lots, and driveways. Installers usually begin their work on a previously prepared base that has been graded to the proper depth, although some projects may include the base preparation. A typical segmental paver installation begins with leveling a layer of sand, followed by placement of the pavers, normally by hand but sometimes by machine. Usually the work includes constructing edges to prevent horizontal movement of the pavers. Sand is then added to fill the joints between the pavers.
Terrazzo workers create attractive walkways, floors, patios, and panels by exposing marble chips and other fine aggregates on the surface of finished concrete. Much of the preliminary work of terrazzo workers is similar to that of cement masons. There are six different types of terrazzo, but the focus of this description is on the most common standard terrazzo: Marble-chip terrazzo, which requires three layers of materials. First, cement masons or terrazzo workers build a solid, level concrete foundation that is 3 to 4 inches deep. Second, after the forms are removed from the foundation, workers add a 1-inch layer of sandy concrete. Terrazzo workers partially embed, or attach with adhesive, metal divider strips in the concrete wherever there is to be a joint or change of color in the terrazzo. For the third and final layer, terrazzo workers blend and place into each of the panels a fine marble chip mixture that may be color-pigmented. While the mixture is still wet, workers add additional marble chips of various colors into each panel and roll a lightweight roller over the entire surface.
When the terrazzo is thoroughly set, helpers grind it with a terrazzo grinder, which is somewhat like a floor polisher, only much heavier. Any depressions left by the grinding are filled with a matching grout material and hand-troweled for a smooth, uniform surface. Terrazzo workers then clean, polish, and seal the dry surface for a lustrous finish.