RIFAT S. AYYAR, P.E. 4726 Fairway Ridge South West Bloomfield, MI. 48323 Home: 248/539-4889 Cell : 248/346-5150
OVERVIEW: An energetic, peak-performance individual with a solid record of achievement in Electrical engineering, design, construction & implementation. A resourceful and Solution-focused professional, recognized for being a team-player and for Designing systems in an economical and cost effective way.
AREAS OF LEED, Power, Lighting & Fire alarm Project construction STRENGTH: systems design Project implementation Highly adaptable Interpersonal & communication skills Time sensitive & budget oriented Direct multiple projects effectively Team Leadership
PROFESSIONALGhafari Associates, Dearborn MI.(07/2008 10/2008) EXPERIENCE:Senior Electrical Engineer Duties; Planning, Scheduling, Coordination, Proposals, Field investigation, Electrical Design (Sever Stall new steel factory, Ford Madison Heights new lighting system, GM technical center new office area proposal, Toyota Ann Arbor modified office building proposal). Reason for leaving; Lack of work because of sudden loss of a large project. Company Recommendations will be provided upon request.
Integrated Architecture, Grand Rapids MI.(08/2007 07/2008) Senior Electrical Engineer Duties; Supervision, planning, Scheduling, Coordination, Cost estimation, Electrical Design and construction follow up (Peckham industries, Michigan state University). Reason for leaving; Seeking better established company & more work security. Elite Engineering Services Inc., Jackson MI.(10/2006 04/2007) Senior Electrical Engineer Duties; Temporary assignment to Consumers energy of Michigan (Facility electrical Design, checking electrical design work by others, Supervising and Training other Engineers on electrical design). Reason for leaving; End of temporary & contracted work.
Integrated Design Solutions, Troy MI.(02/2003 07/2006) Senior Electrical Engineer 5 Duties; Planning, Electrical design, Quality assurance and construction follow Up (Remodeling all fifteen schools in Southfield MI., New South Lyon East H. School, Shrine Church additional building and New UM Museum in Ann Arbor MI.). Reason for leaving; Lack of work due to general economical problem. RIFAT S. AYYAR, P.E.
PROFESSIONAL Superior Engineering Group Inc., Southfield MI.(02/2001 01/2002) EXPERIENCESenior Electrical Engineer (Cont):Duties; Planning, Electrical design, Quality assurance and construction follow Up for various projects (Warren community center, Canton human services, Almar Bowling alley and ITS Ford plant improvement). Reason for leaving; Lack of work due to general economical problem.
AKA Inc., Detroit MI.(02/1999 04/2000) Senior Electrical Engineer Duties; Electrical design, Construction, Quality assurance and cost estimation Using micro station drafting of various projects (GM suites, Guardian Industries New plant, Beaumont hospital new CT scan room and AKA building first floor Renovation). Reason for leaving; Lack of work due to general economical problem.
MMI, Detroit MI.(11/1989 01/1999) Project Manager and Senior Electrical Engineer Duties; Planning, Coordination, Scheduling, Bid preparations, Approval of Invoices, Review and correct documents and drawings, Providing additional Information and documentation for the recommendations to the contractors, Quality assurance, Cost estimation, Electrical design and checker of various Projects (Housing groups, Detroit and Wyandotte water/sewage pump stations Improvements and Detroit Metro airport improvements). Reason for leaving; Lack of work due to general economical problem.
ARA Inc., W. Bloomfield MI (10/1987 11/1989) President and Project Manager Duties; Planning, Coordination, Scheduling, Electrical power design, Lighting Design and construction of residential projects. Reason for leaving; Lack of work due to general economical problem.
I.P.G. Inc., Troy MI.(06/1984 10/1987) Senior Electrical Engineer Duties; Design and supervision of different projects for G.M. Corporation to Include Lighting, Power distribution, Control circuit modifications, Fire alarm Systems, Computers clean power design, Gates security systems using fiber Optic cables and Conveyors systems using A.B. programmable controllers. Reason for leaving; To create my own company.
RIFAT S. AYYAR, P.E.
PROFESSIONALGiffels, Southfield MI.(10/1981 06/1984) EXPERIENCEElectrical Engineer II (Cont):Duties; Project design checker, Electrical design and evaluation of different Projects for Detroit Edison Co. to include (Checking and Modification of Electrical, Instrumentation and Control circuits designed by others for FERMI II Project in Monroe MI. and Evaluation of the U.P.S. system for the Detroit Edison Company main electrical room in Detroit MI.). Reason for leaving; Seeking larger responsibilities and more work security.
City of Detroit/WWTP, Detroit MI.(06/1980 10/1981) Associate Electrical Engineer Duties; Designed and supervised installation of various projects to include (Plant Electrical single line diagrams, Designed new control system for the disposal of Sludge cake, Modified the ash handling control system in complex II, Purchased Equipments and supplies to maintain the plant electrical equipment operations). Reason for leaving; Seeking relocation and larger responsibilities.
EDUCATION:Bachelor of Science in Electrical Engineering from Baghdad University in Baghdad, Iraq
MEMBERSHIP:Professional Engineer in Michigan since 1981, I.D. # 6201028023 Professional Engineer in California since 2002, I.D. # E16861 Residential Builder in Michigan since 1987, I.D. # 2102079762
PERSONAL:Married, three children, US citizen, willing to relocate, excellent health
REFERENCES:Available upon request
|