Cell (321) 863-2865 Gary L. Goodwin Resume Partner & License holder for Support 100 Construction, LLC Fl License #CGC - 1512212 2006-2008 Started this construction firm to build for our own account, had a 189 unit condo project set to go when market turned Converted a beauty college into a 250 seat sanctuary for East Coast Christian Center Converted a restaurant into an Irish Pub with restaurant, & converted a store front into a Irish Pub, both of theses projects were done for a international pub company Owners Representative on a 3 site 5 building project that the general contractor got in trouble on, I am overseeing the completion of these projects Numerous renovation projects both commercial and residential 2001- 2004 BRPH Construction Services Estimator - Project Manager Harris Missile Defense System Fixed Site Radome Building, Harris Relocatable Missile Defense Radome Buildings and Sea Based Radomes Calvary Chapel West Melbourne - Administration Building, 3 Story Education Building and 53,000 SF, 3000 seat Sanctuary total over $10,000,000 Ascension Catholic Church Gym 1998 - 2001Construction Consultant Consulted with various owners on the following projects: Circuit City- Merritt Island Church Expansion Project- Merritt Island Worked with site work contractor to expand his business Responsibilities included estimating, budget control, subcontractor selections and contract preparations, schedule preparation & control, construction oversight, interfacing with local authorities & inspectors, procurement of certificate of occupancies
1996-1998Island Systems & Design Rockledge, FL Director of Construction Responsible for establishing design & installation standards for this international audio/video company specializing in $1,000,000+ systems for high-end users Met with clients to establish system requirements Hired & trained installation crews Established design details & standards for installation Saved hundreds of thousands on design & specification changes Made site inspections and work with general contractors & electricians on layout & installation requirements, proper cabling etc. Scheduled & oversaw new installations
1988-1996 Specialty Builders, Inc Merritt Island, FL President/Owner Directed this startup company into a national hotel & restaurant renovation & conversion firm. Worked with various national hotel firms in establishing renovation & conversion scopes of work, established budgets, contracted with subcontractors, hired crews and oversaw work through job site superintendents Worked throughout the United states with repeat clientele 1971 1988P. J. Goodwin Corporation Merritt Island, FL President/Owner Acquired the reins of this hotel/motel construction firm after the untimely death of my father. At the time we had 8 hotels & restaurants under construction from the Florida Keys to Cincinnati, Ohio. Under my leadership the firm grew to in excess of $15,000,000 (1985 $) a year inn sales First in Brevard County to undertake tilt-wall construction Constructed first Albertson Food Store in state of Florida Some of our many clients: Howard Johnson Company over 30 motels, Ramada Inns (5), Econo Lodges (2), Albertsons (5), Family Mart (4), Harris Corporation (8) Florida Power & Light, Southern Bell (4), Barnet Banks (3), University of Central Florida, Florida Institute of Technology(2) and many, many others. Built throughout the Southeast US
Education Bachelor of Science, Building Construction 1970 M.E. Rinker School of Building Construction, University of Florida Licensees Held General Contractor State of Florida CGC-1512212 Private Pilot License Multi-Engine instrument rated
Gary L. Goodwin Project List
New Construction
Commercial Buildings
ITT North Electric Waterfront Office Bldg (55,000 SF) : Piling, precast structure with decorative precast exterior facing
NorskHydro Aluminum Manufacturing Plant (100,000 SF): Pre-engineered metal building, heavy foundations for aluminum extruders, heavy electrical service
Harris Corporation Engineering Buildings (over 500,000 SF five 2-story buildings -): Self-performed tilt wall construction, steel frame, metal deck, concrete 2nd floor, roof bar joist, metal roof deck, EMT Vaults
Harris Semi-Conductor Office Buildings (two 3-story buildings over 200,000 SF): Self-performed tilt wall, steel frame, bar joist, metal deck, concrete floors, bar joist, metal roof deck
Harris Semi-Conductor Manufacturing Plant ( over 200,000 SF) : Concrete structure with waffle slab design, clean rooms, offices, water and sewer plants
Harris Government Systems Fixed Radome building (test building) and Re-locatable Radome Buildings (2 operational buildings) for missile defense system : Re-locatable buildings built to ship-building and design standards for world wide relocation
Saundry Industrial Park (140,000 SF - 3 bldgs 30,000 SF each and 1 bldg 50,000 SF): Design/Build, self-performed tilt wall interfaced to pre-engineered metal building structures, metal roof decks
Eckler Corvette 2-story, Showroom, Offices, Warehouse (60,000 SF ) : Self-performed tilt wall, steel frame, bar joist, metal roof deck
Calvary Chapel Administration Bldg (15,000 SF), Court Yard (10,000 SF), 3-story Education Bldg (30,000 SF), 3,000 seat Sanctuary (53,000 SF) : masonry, steel frame, bar joist, metal roof deck, (project total over $10,000,000)
Self-developed and owned 2-story Office Building (10,000 SF) : Masonry, Hambro system second floor structure, trusses
Self-developed and owned two Winn-Dixie Shopping Centers with Eckerd Drugs as major tenants (78,000 SF and 275,000 SF)
FPL Offices- 2
Southern Bell Offices 4
Barnett Banks - Branches 4
Motels/Hotels Design/Build Projects
Howard Johnson 11-story High Rise Pompano Beach : Piling, structural concrete frame, masonry, flat slab, includes in-house restaurant, parking garage, and 3rd floor pool
Howard Johnson Mid-Rise Palm Beach : Piling, steel frame construction, flat slab, in-house restaurant, and pool
Howard Johnson Motel Speedway 40-unit expansion - Daytona Beach : Load-bearing masonry with precast 2nd floor, concrete roof joist with Tectum roof deck
Ramada Inn Motel & Dutch Inn Restaurant 100 unit Gainesville : Load-bearing masonry with precast 2nd floor and roof deck, pool
Howard Johnson Motel & Restaurant 104 units - Key Largo : Load-bearing masonry, 2nd floor precast, concrete roof joist, Tectum roof deck, pool
Howard Johnson Motel & Restaurant 104 units Marathon : Load-bearing masonry, 2nd floor precast, concrete roof joist, Tectum roof deck, pool
Ramada Inn & Jerrys Restaurant 100 units - Winter Haven : Load-bearing masonry with precast 2nd floor and roof deck, pool
Howard Johnson Motel & Restaurant 104 units Davenport: Load-bearing masonry with precast 2nd floor and roof deck, pool
Howard Johnson Motel (5- story) & Restaurant 200 units - Erlanger, KY: Load-bearing masonry, flat slab, pool
Howard Johnson Motel & Restaurant 104 units - Tarpon Springs: Load-bearing masonry with precast 2nd floor, concrete roof joist with Tectum roof deck
Ramada Inn (5-story) & Nelly Kellys Restaurant 200 units Clearwater: Load-bearing masonry, precast slab, pool, tennis courts
Economy Lodge & Perkins Restaurant - Cocoa Beach: Load-bearing masonry with precast 2nd floor and roof deck, pool
3 Penny Inn 100 units Wildwood: Load-bearing masonry with precast 2nd floor and roof deck
Food Stores/Shopping Centers
Albertsons 55,000 SF ea - Clearwater, Saint Petersburg, Orlando, Pensacola, Tallahassee, and Stuart FL: Masonry, self-performed decorative tilt wall, steel frame, bar joist, metal roof deck
A&P Super Stores (Family Marts) - 50,000 SF ea - Greenville, SC (2), Macon, GA, Warner Robins, GA : Self-performed decorative tilt wall, steel frame, bar joist, metal roof deck
Nationwide Renovations
Renovation & Conversions of Restaurants - over 25 - Howard Johnson Restaurants plus numerous in-house hotel restaurants across USA
Hotel Renovations - Hiltons, Omnis, Howard Johnsons, Ramada Inns, Holiday Inns: Over 1,500 rooms, ballrooms and commercial space across the USA
|