Name : Michael Patterson
Industry Type : General Contractors - Managers
City & State : Rogers, AR
Job Title Construction Manager
Relocation Preferences : Job pereference
Objective : To be a part of a project team with responsibilities for P&L, Schedule and project construction.
Resume :  
RESUME

NAME:Michael A. Patterson

ADDRESS: Rogers, Arkansas 72756

PRIMARY CELL PHONE:573-808-3221
SECONDARY CELL PHONE:859-608-9526


MARITAL STATUS:Married
Three Children, all grown

AFFILIATIONS: Promise Keepers, H.O.G., Christian Motorcycle Association

INTEREST:Computers, Reading, Motorcycles, Corvettes, Art, Photography, Architectural Design, and Music

To Whom It May Concern:

Thank you for the opportunity to present you with my resume. I have been working in the construction industry for over thirty-seven (37) years. I have been involved in construction, maintenance and re-building of various types of projects with different craft disciplines, in many different facilities including, but not limited to: petro-chemical plants, paper mills, power plants, plywood plants, plastic plants, packaging plants, ship yards, steel mills, fabrication shops, and residential construction. For over twenty-seven (27) years I have worked as a construction manager, superintendent, project engineer, coordinator, subcontract administrator, or project manager. I have extensive experience in construction sales and estimating with a proven track record of results. I have owned and managed my own consulting business that provided construction management services for companies that did not need a full time construction engineer or manager for their capital projects. I have perform all phases of construction management including project supervision, contract administration, design, engineering, cost estimating and scheduling, subcontract administration, material take off and procurement for companies whose capital projects ranged from 10K to 470MM. Having been the sole proprietor of a company, I was responsible for all work associated with owning a business that included marketing, sales and estimating, scheduling and coordination. In addition to the above-mentioned duties I have also done tank farm and piping design, equipment and building layout, construction management and project construction. I am very proficient with a computer and skilled on all of the Microsoft programs and various other computer software programs. I have been trained in drafting and am very precise and detailed on both board and Turbo-CAD. Ive managed projects with contract values up to $470 million dollars. While being in project management, I have managed multiple projects at one time, coordinating not only company personnel but also subcontractors. I have managed direct personnel and subcontractors in a union environment as well as a non-union environment with successful results. Due to my field, supervision and project management experience I have developed excellent communication skills, both written and verbal. I take pride in my ability to take minimal information and produce maximum results with emphasis on customer satisfaction and overall profitability of the projects that I am involved with. My focus on detailed planning and my strong commitment to safety and quality both during the design phase and construction phase of a project has allowed me to maximize profits for the companies I have worked for. I have conducted several training seminars to help employees understand their construction trade better and give them the knowledge to perform their jobs in a safer and more professional manner. In addition to my construction background, I have also been directly involved with maintenance management and training. With the industrial construction and maintenance knowledge I have and the integrity that being a Christian brings to my life, I feel that I can be an added asset to any company. I have a current passport and have worked overseas. I am willing to travel for long term or short-term projects anywhere a company requires that I go. If you should have any questions, please contact me at the numbers listed above. I will be happy to supply any information you might require and discuss my background with you. Again, let me thank you for the opportunity to present my resume to you. I will be looking forward to hearing from you in the near future.

Sincerely

Michael A. Patterson

OBJECTIVE:I am interested in working as a construction manager, superintendent, field coordinator, project engineer, or site manager, for the supervision or management of projects or crews in the petrol chemical, power, high speed packaging, heavy industrial, utility or commercial construction environment as contract or full time employee.

EXPERIENCE
EMPLOYMENT: Buzzi Unicem USA - Festus, Missouri
POSITION(DEC 2007 TO SEP 2009) SITE CONSTRUCTION MANAGER
LOCATIONBuzzi Unicem, River 7000 Project Festus, Missouri
DUTIESI had total responsibility for the management of construction site installation and commissioning of all equipment and materials, all contractors and their subs to ensure the River 7000 project was constructed safely, incompliance with Buzzi requirements, on time and within budget. My duties included, oversight of construction with respect to safety, supervision, planning and scheduling and direction of the Buzzi construction team, scheduling and coordination of contractors activities, review of drawings and design with respect to constructability, active participation in construction planning meeting with all contractors, coordination between contractors, monitoring and forecasting of construction costs, monitoring all construction cost and change order controls, resolution of all construction conflicts and constructability issues, identification of constructability problems and implementations of solutions, reporting on construction progress and anticipation of corrective measures if required and dealing with all union issues between contractors. I implemented a PBS safety program with all contractors and set up criteria for all disciplinary actions for any safety infraction. I set up a receiving department and database to unload and track all deliveries of equipment for project.

EMPLOYMENT:TIC The Industrial Company - STEAM BOAT SPRINGS, COLORADO
POSITION(FEBRUARY 2000 TO DEC 2007) Project Engineer, Mechanical Coordinator, Subcontract Administrator
LOCATIONDell Power Project, - Dell, Arkansas, Profume Chemical Dow Pittsburg California, Hot Springs Power Project - Malvern Arkansas, Chehalis Power Project - Chehalis Washington, Hermiston Power Project - Hermiston, Oregon, Lone Star Cement Green Castle, Indiana
DUTIESDuring the projects I worked on with TIC my duties were task planning, project cost control, budget development, scheduling, RFQ development and equipment procurement, sub contract administration and development, safety management, material management, developing and approving heavy rigging and lift plans and field coordination of resources. Projects included installation of Siemens 501Fs, 501G and GE 7FA Combustion Turbines, Siemens Westinghouse KN and Alstrom Steam Turbines, Doosan and Nooter Eriksen HRSGS, and a variety of other equipment associated with 2 on 1 Power Projects. In addition to equipment installation in the power industry, I also coordinated the installation of Fuller material handling equipment for a cement facility,
EMPLOYMENT:NECO LLC LEXINGTON, KENTUCKY
POSITION(FEBRUARY 99 TO FEBRUARY 2000)-Branch Operations Manager for Millwright and Heavy Rigging Company
LOCATIONLexington, Kentucky
DUTIESIt was my responsibility to direct daily operations for a company that specializes in heavy rigging, equipment moving and millwright work. I developed customer contacts, perform bid proposals, developed all lifting and equipment moving plans and project managed all work awarded. In addition, I also use my experience to train personnel in safe work practices, heavy rigging, custom fabricating, MIG, TIG and stick welding and precision millwright work. I was responsible for developing operating budgets for the year, evaluating all capital expenditures, developing business plans, interviewing and hiring all new field personnel and supervisors and developing and implementing procedures to help with the growth of the company.

EMPLOYMENT:PATTERSON CONSULTING SERVICES - COLUMBIA, MISSOURI
POSITION(JULY 97 to FEBRUARY 99) Construction Project Management/Supervision
LOCATIONWORLD WIDE
DUTIESI was the owner and operator of a construction management consulting company. I specialize in projects involved in the petrol chemical industry, power industry, packaging industry, and commercial construction industry. Some of the services I offered were project management, project supervision, project scheduling, project estimating, quality control, 3rd party inspections, safety surveys, crane sizing, heavy rigging and lift plans, problem solving, contract development and administration, design and engineering, document control, sales and marketing for my company and all business activities required for managing a personal company. My projects ranged in size from $10K to $50MM. I did projects both in the US and overseas and adapt well to changing conditions, environments and cultures.


EMPLOYMENT:GLOBAL INTERMARK CORPORATION - MOBERLY, MISSOURI
POSITION(FEBRUARY 1997 to JULY 1997) Equipment Marketing Director, Sales Manager
LOCATIONUSA
DUTIESI devoted full time energies to developing and implementing the companys equipment divisions sales and marketing services, and provide support and guidance to the overall operations and sales of used environmental equipment. I performed equipment evaluations and appraisals, provide marketing support by developing advertisements, developing and sending out brochures, doing presentations, and developing specialized selling documents, which included equipment descriptions, digital pictures and evaluations. I was also required to do construction proposals for the installation of equipment for clients including, design drawings for foundation layouts, equipment layout drawings and electrical load requirement work ups. I developed company procedures for sales, marketing, contracts for every aspect of our business and general operating procedures for our business. I worked directly with the technical division of the company to develop construction plans and safety plans for equipment removal and transportation, coordinated contractors with clients and insured that their equipment was installed properly and operating as required. I developed a data base system in Access to help us track our clients and our equipment to make our selling efforts more effective.

EMPLOYMENT:KOCH ENGINEERING COMPANY, INC. WICHITA KANSAS
POSITIONS(December 1990 to October 1996) Construction Sales Engineer, Project Manager, and Project Superintendent
LOCATIONEastern US, Gulf Coast, Europe, Mexico and South America for Koch Field Service
DUTIESI was responsible for regional sales, marketing, project estimating, customer contact, site visits and evaluation, customer service, subcontract development and management, project scheduling, equipment and material specification and procurement, personnel evaluation and hiring, piping design and layout, development of crane and rigging plan for both heavy and high liability lifts, development of construction safety plans and supervision of project construction for the installation of combustion equipment supplied by the John Zink Company of Tulsa, OK. I was responsible for developing all correspondence needed for sales follow-up to clients and generating all preliminary schedules for work to be done. I also assist in sales forecasting, marketing plans and craft training when required. I developed site specific safety procedures as required for individual sites and was key in the implementation of OSHA, MSHA and/or our company safety policies based on the hazards of the projects.

EMPLOYMENTPATTERSON CONSULTING SERVICES, KANSAS CITY, MISSOURI
POSITION(December 1988 to December 1990) Construction and Engineering Consultant
LOCATIONUSA
DUTIESProject Design, Plant management, Construction and Maintenance management for small companies that did not need full time engineers or construction managers. Specializing in capital project coordination and project management, for the design and installation of high speed packaging lines for food processing plants, breweries, oil packaging facilities and grease plants which included everything from grass root design to modification of existing systems. I was a single point of responsibility for projects entrusted to me.


EMPLOYMENTLUBRIPAC, KANSAS CITY, MISSOURI
POSITIONS(October 1987 to December 1988) Project Coordinator and Maintenance Supervisor
LOCATIONKansas City, Missouri
DUTIESProject Coordinator/Construction Manager for a $3.2 million plant expansion. Plant maintenance supervisor and plant engineer/construction coordinator for a 75 million gallon per year packaging facility. I was the point of contact between construction subcontractors, plant maintenance personnel and project engineering. I developed RFQs and awarded all subcontracts, set up safety programs for maintenance crews, did all planning and scheduling between production, maintenance and construction subcontractors, worked directly with engineering to develop the best plan for the facility that was the most constructible and did minor design and engineering work for both the maintenance department and capital project work and procured capital equipment. I insured that the budget and schedules were met and that the maximum utilization of resources was achieved from the moneys that we were spending.

EMPLOYMENTBROWN & ROOT CONSTRUCTION COMPANY, HOUSTON, TEXAS
POSITIONS(March 1983 to August 1987) Project manager, Project Superintendent, Millwright General Foreman, Millwright Foreman and Millwright
LOCATIONMajor construction projects through out the US
DUTIESAs a construction project manager I supervised subcontracts and did scheduling for different types of projects. I was involved with budget analysis of work and man-hours to insure the maximum efficiency of the company personnel. As a Project Superintendent I supervised project construction, which included personnel management, equipment management, cost management, scheduling, and subcontract coordination. As a Millwright General Foreman I supervised several millwright crews on different projects, coordinating work and manpower loading to maximize productivity and utilization of allotted man-hours. As Millwright Foreman I was responsible for front line supervision of crews on different projects. I had to schedule manpower and assign duties with the best utilization of personnel and equipment possible to insure that the projects were completed on time and within budget. As a Millwright I was involved with the precision alignment of high speed rotating equipment, welding, crane operating and rigging, pipe fitting, structural steel erection and foundation installation.

EMPLOYMENTTEXAS ENVIRONMENTAL ENTERPRISES, HOUSTON, TEXAS
POSITIONS(February 1982 to March 1983) Project manager, Project Superintendent, Maintenance Manager
LOCATIONHouston, Texas
DUTIESDesigner/Fabricator and installer for a waste water management company servicing the MUD districts in the Houston area. I did design and engineering work, procurement of materials and equipment and installation of different types of equipment for several MUD districts. I also worked with other engineering firms and did special fabrication of certain equipment including; clarifier rakes, air injection systems, overflow catches and waste diverters, blower assemblies, collection systems and new lift pump installations. I also did maintenance on lift stations, sludge presses, polymer injection systems and air blower systems. All of the work that was performed had to meet the strict guidelines of the Texas Water Commission standards and was scrutinized by MUD board members.

EMPLOYMENTBROWN & ROOT CONSTRUCTION COMPANY, HOUSTON, TEXAS
POSITIONS(August 1972 to February 1982) Millwright Foreman, Millwright, Pipe Fitter, Certified Welder (pipe and structural), Fabricator/Fitter, Rigger and Heavy Equipment Operator
LOCATIONConstruction projects in the US.
DUTIESI started out in the construction industry working as a helper for the electrical department in Lone Star Steel. After five years at that facility, I had worked as a journeyman, millwright, rigger, structural fabricator, welder and pipe fitter. I had proven that I was very capable of performing any task asked of me and I had supervision qualities. I was promoted to a foreman and Superintendent on several projects through the first 10 years of my career with Brown and Root. I had demonstrated that I was a dedicated person and that I would do whatever was best for the outcome of a project and the betterment of the company. My main concerns were always with quality, safety and customer relations, always keeping site of the profitability of each project I was assigned to. I mastered the crafts of precision millwright work, pipe fitting, heavy equipment operation and rigging, welding, structural fabrication and iron working. My specialty was always rotating equipment alignment and installation with the emphasis on turbine rebuilds shutdown work being my specialty.

EDUCATION AND SPECIAL TRAINING

LOCATIONCOURSE OF STUDY
BUZZI UNICEM USA30 Hour MSHA Training
TIC THE INDUSTRIAL COMPANYSupervisor Safety Training Level 1Supervisor Safety Training Level 2 (OSHA 10 Hour)Superintendents TrainingField Engineers TrainingUnderstanding Contract ProvisionsHiring Plan TrainingPurchasing ProceduresDeveloping and Managing ResourcesWBS CMIS EEO/Affirmative ActionDiversity in the Workplace FundamentalsCommunicate to Achieve ResultsSpeaking in Front of othersHand ToolsMedic First Aid TrainingFall ProtectionExcavation and Trenching SafetyCrane SafetyRigging SafetyElectrical SafetySafety Management SystemsSafety Task PlanningProductivity ReportingPlanning and Executing WorkCrew Productivity and PlanningHAZCOMLEI TrainingSLS TrainingFront Line Supervisor SkillsUnion Activity Guidelines for SupervisorsJob Cost ReportingContract and Subcontract IssuesPay for Performance and Employee Performance AgreementsCore ValuesScheduling BasicsP3 SchedulingSure Track SchedulingCMMS Materials Management SystemsPrologEncompassThink and Plan
KOCH ENGINEERING FIELD SERVICESignature Service - Key to Customer SatisfactionCPR and First Aid TrainingProject Safety Management2 - 10 Hour OSHA Safety CourseFlare TechnologyVapor Recovery and Incinerator TechnologyBurner TechnologyFranklin Time Quest, Time ManagementQuality Supervision/Project ManagementCrane and Rigging sizing and safety
FRED PRYOR SEMINARSComplete Project Management


LOCATIONCOURSE OF STUDY
AMARILLO COLLEGE, AMARILLO, TEXASConversational Spanish
NORTHGATE COMMUNITY COLLEGE, KANSAS CITY, MO.Intro. To micro computer Intro. To IBM DOS
WRIGHT STATE UNIVERSITY, KANSAS CITY, MO.Maintenance Management and Scheduling
LUBRIPAC7 Habits of Highly Affective PeopleSafety ManagementProject Management for Production FacilitiesMore Effective SupervisionBoiler MaintenanceConveyor Design Packaging Principles
NOLAN TECHNICAL INSTITUTE, DALLAS, TEXASMotorcycle Mechanics and Welding
INTERNATIONAL CORRESPONDENCE SCHOOL, PORTLAND, ORDrafting
INTERNATIONAL CORRESPONDENCE SCHOOL, SCRANTON, OHBasic Electricity
COMBINED INSURANCE COMPANIES OF AMERICASales and Marketing Training
BROWN & ROOT, HOUSTON, TEXASMaintenance SupervisionProject Management I & IIHandling Problem Employees,Quality Supervision I & IISafety on the Job SiteTurbine Alignment,Welding Symbol and Blue print InterpretationMIG and TIG Welding FundamentalsPipe fitting I & IIMillwright mechanics I & IICrane and Rigging Fundamentals



Project List
Combustion Equipment
FacilityLocationProject Type$ ValueDuties
Hot Springs Power ProjectMalvern, Arkansas2 x 1 combined cycle power plant400MMechanical Coordinator
Chehalis Power ProjectChehalis, Washington2 x 1 combined cycle power plant380MProject Manager
Hermiston Power ProjectHermiston, Oregon2 x 1 combined cycle power plant362MMechanical Coordinator
Callidus CorporationTulsa, OklahomaGround flare installation procedure2.1MConsultant Develop Procedure
SK CorporationUlsan, Korea2- ZTOF Flare installations42MConsultant Construction Manager
VastarGrand Chenier, LA250' Guy wire flare installation3.2MConsultant Construction Manager
VastarGrand Chenier, LA50' Temporary flare installation220KConsultant Construction Manager
Koch PipelineMedford, OKRe-tube process heater1.23MConstruction Manager
Amoco ChemicalChocolate Bayou, TX290' flare tip replacement1.9MConstruction Manager
Amoco ChemicalChocolate Bayou, TXPiping replacement on 290' flare325KConstruction Manager
KanekaPasadena, TXThermal Oxidizer rebuild402KProject Manager/Construction Manager
Dow ChemicalFreeport, TXZTOF Flare installation1.1MProject Superintendent
Rhone-PoulencOil City, PE125' self supported flare installation1.75MProject Manager
Rhone-PoulencOil City, PE100' derrick flare removal275KProject Manager
Farmland IndustriesCoffeyville, KSLow NOX burner installation400KProject Superintendent
Ciba GiegyNewport DEWaste gas incinerator installation225KProject Superintendent
Dupont ChemicalLa Place, LA250' self supported flare installation1.25MProject Superintendent
Texaco ChemicalPort Neches, TX2 waste gas incinerator installations2MProject Manager/Sales Manager
NASA Test FacilityStennis, MS125' flare installation275KConstruction Manager
Stolt TerminalsHouston, TXMarine Vapor Control system installation979KProject Manager/Sales Manager
International Paper CompanyMoss Point, MSZTOF flare installation253KProject Manager/Sales Manager
Union Pacific ResourcesCarthage, TX150' guy wire flare installation625KProject Superintendent

Combustion Equipment cont.
Mobil OilChalmette, LAElevated LRGO flare rebuild890KProject Superintendent
ConocoNorcross, GAVapor Control system190KProject Superintendent
Coastal ChemicalBattle Mountain, NVLow NOX Burner and wind box installation335KProject Superintendent
Sinclair RefiningSinclair, WY100' self supported flare installation282KProject Superintendent
Texaco ChemicalOklahoma City, OKZTOF flare installation100KProject Superintendent
Trident NGL, Corp.Mt. Belview, TXElevated LRGO flare rebuild200KProject Manager
Southwest RefiningCorpus Christi, TX350'derrick flare rebuild678KProject Manager
Amoco ChemicalDecatur, ALMarine Vapor control system installation902KProject Superintendent/Project Manager
BASFChattanooga, TNZTOF flare installation227KProject Superintendent
Oxy ChemicalChocolate Bayou, TXLow NOX burner installation127KProject Superintendent




High Speed Packaging
FacilityLocationProject Type$ ValueDuties
Sheds Food PackagingOlathe, KSButter packaging line installation1.7MConsultant Construction Manager
Farmland IndustriesAmarillo, TXLube oil packaging system design, procurement and installation8MConsultant Design Construction Manager Procurement
Farmland IndustriesAmarillo, TXTank farm redesign and installation7.33MConsultant Design Construction Manager Procurement
Farmland IndustriesNorth Kansas City, MOGrease Packaging system expansion, design, procurement and installation2.25MConsultant Design Construction Manager Procurement
Lubripac Corp.North Kansas City, MOLube oil packaging system design, procurement and installation3.1MDesign Construction Manager Procurement
Lubripac Corp.North Kansas City, MOMove tank farm from Chicago, IL to NKC1.7MProject Manager Maintenance Supervisor
Lubripac Corp.Houston, TXLube oil packaging system installation40MMillwright Superintendent
Mrs. Bairds BakeryHouston, TXBread Baking Plant Construction22MMillwright Millwright Supervisor
Uncle Ben's RiceHouston, TXRice dryer and conveyor installation2.7MMillwright General Foreman
Uncle Ben's RiceGreenville, MS3 Rice dryers and conveyor systems installed6MMillwright General Foreman
Continental Can CorporationLongview, TXCan manufacturing system installation2.2mMillwright Rigger Electrician
Schlitz BreweryLongview, TXFilling line equipment installation1.11MMillwright Rigger Electrician


Process Equipment
FacilityLocationProject Type$ ValueDuties
Sun Oil CompanyTulsa, OKTray and Packing installation1.7MProject Superintendent
Champion Paper millPensacola, FLPaper Machine rebuild7.7MMillwright General Foreman
Texas United Chemical CompanyLake Charles, LACalcium Chloride plant construction4.4MMillwright General Foreman
Amoco ChemicalTexas City, TXCO-Generation construction225MMillwright Turbine Alignment

Process Equipment cont.
Amoco ChemicalTexas City, TXWater Clarifier installation22MMillwright General Foreman
Texas Eastman CompanyLongview, TXEthylene Glycol plant rebuild18MMillwright Rotating equip. Alignment
Champion Paper MillCortland, ALPaper machine rebuild8.9MMillwright General Foreman
Stoffer Chemical Co.Houston, TXAcid Plant rebuild7.77MMillwright Superintendent
Stoffer Chemical Co.Houston, TX500' vent stack rebuild2.66MMillwright Rigger Supervisor
St Regis Paper Co.Sheldon, TXPaper machine rebuild8.88MMillwright
Kirby Plywood ProductsCleveland, TXPlywood plant rebuild13MMillwright
Champion Paper MillPasadena, TXHead Roll and Calendar section on paper machine rebuild7.7MMillwright Foreman
Ethyl CorporationDeer Park, TXEthylene compressor rebuild3.3MMillwright Millwright Foreman
Champion Paper MillPasadena, TXRe-pulper rebuild4.99MMillwright Foreman
Champion Paper MillPasadena, TXTank farm rebuild2MPipe Foreman Millwright Foreman
Big 3 CorporationVictoria, TXSulzer and Joy compressor installation6.6MMillwright Millwright Foreman
IMCO ServicesHouston, TXBarite plant design and installation5.2MMillwright Structural Fabricator Crane Operator
IMCO ServicesHouma, LABarite plant design and installation4.44MMillwright Structural Fabricator Crane Operator
Stanco Bolt CompanyHouston, TXPlant move1.63MMillwright
Union Carbide CompanyDeer Park, TXHitachi compressor installation3.75MMillwright Turbine alignment
Champion Paper MillPasadena, TXHeat Recovery Boiler Rebuild1.9MBoilermaker Pipe Fitter
Otis Engineering Houston, TXPipe Threading system installation3MMillwright Foreman Millwright
Brown and Root Marine YardHouston, TXOff Shore platform fabrication600MHeavy Rigger
Texas Medical CenterHouston, TX4-Steam turbine installations2.8MMillwright Millwright Foreman
U.S. GypsumGalena Park, TXPaper machine rebuild and alignment22MMillwrightMillwright Foreman

Process Equipment cont.
Arco Chemical CompanySheldon, TXTurbine and compressor rebuild51MMillwright Millwright Foreman
Cameron Iron WorksHouston, TX29,000 ton press installation271MMillwright Pipe fitter Millwright Foreman
Cameron Iron WorksHouston, TXTool and Die shop layout and installation18MMillwright Foreman
Kirby Plywood productsCleveland, TXHydrostatic drum de-barker installation108MMillwright
Lone Star SteelLone Star, TXOpen hearth rebuild32MMillwright
Lone Star SteelLone Star, TXPipe Mill rebuild16MMillwright Foreman
Lone Star Steel Lone Star, TXIron ore plant rebuild27.2MIron Worker Millwright
Lone Star SteelPoteau, OKCoal plant disassembly and move13.8MMillwright Crane Operator
Lone Star SteelLone Star, TXCoal plant assemblyMillwright - Crane Operator
Lone Star SteelPoteau, OKMarion Drag line rebuild7.7MMillwright Millwright Apprentice
Kinco ServicesHughes Springs, TXMachine Shop equipment rebuild882KMaintenance Mechanic
Pipe EngineeringHughes Springs, TXPipe Threading equipment rebuild630KMaintenance Mechanic
Lone Star SteelLone Star, TXCoke oven rebuild1.1MMillwright Apprentice
Lone Star SteelLone Star, TXPipe extrusion plant installation72MMillwright Apprentice Crane Operator
Lone Star SteelLone Star, TXMechanical Tubing Plant installation27.6MMillwright Apprentice Crane Operator


Miscellaneous Projects
FacilityLocationProject Type$ ValueDuties
Buzzi Unicem USAFestus, MissouriManage erection of a new 7000 TPD cement plant for Buzzi368MConstruction Manager
TIC/Fuller/Lone Star CementGreencastle, IndianaInstall new cement plant equipment for Lonestar Cement250MConstruction Coordinator
James N. GrayGeorgetown, KentuckyBuild and install scrap bunkers for Toyota1.75MOperation Manager
PSI/KobeErlanger, KentuckyOffload and install tire machine for Toyota200KOperation Manager
Krauss MaffeiFrankfort, KentuckyOffload and install 14 extrusion presses432KOperation Manager
Cornerstone Baptist ChurchColumbia, MissouriParking lot enlargement2.5KConsultant Construction Manager

Miscellaneous Projects cont.
Global IntermarkMoberly, Missouri Environmental Equipment Sales102MSales Manager Equipment Appraisal
Texas Environmental EnterprisesHouston, TexasMUD district blower alignment and rebuild33KOwner Contractor
Texas Environmental EnterprisesHouston, TexasMUD district water system modification8.7KOwner - Contractor
Texas Environmental EnterprisesHouston, TexasWaste water treatment plant modification33.2KOwner - Contractor
Texas Environmental EnterprisesHouston, TexasMaintenance for several MUD districts waste water treatment plants 7.75KOwner Contractor
Texas Environmental EnterprisesHouston, TexasSludge press rebuild and modification3.8KOwner Contractor
PersonalVaried locationGeneral home and property modifications75KOwner - Contractor









A/E/C executives access six figure construction jobs (construction management jobs), architect jobs, civil engineering job and facility manager jobs. CE lists a variety of construction management positions, construction company jobs and construction vacancies, including civil engineering vacancies, construction engineering jobs, architecture jobs, facility management jobs, construction sales jobs, construction manager jobs, construction engineer jobs, environmental engineering jobs, chief estimator jobs, construction director jobs, president jobs, business development manager jobs, marketing director jobs, senior mechanical engineer jobs, senior electrical engineer jobs, chief engineer jobs, senior interior designer jobs, chief financial officer jobs, safety director jobs, senior structural engineer jobs, facilities director jobs, senior property manager jobs, diversity jobs and facilities management jobs.

Employers view interactive construction resumes, mechanical engineer resume or architect resumes, and research construction job descriptions, construction salaries or civil engineer salaries. Job seekers advance their construction management careers and secure construction manager employment, facilities management employment, and civil engineering employment.