RESUME
Engr. Atif Wazir
PERSONAL DATA
NameAtif Wazir Fathers NameWazir Muhammad Khan AddressVILLAGE DARGAI TEHSIL AND POST OFFICE DARGAI,DISTRIC AND DIVISION MALAKAND N.W.F.P Telephone+92-932332650Mobile:- +923339255909 +923009357001 E-mails atifwazir[at]hotmail.com
CNIC15401-0694553-5
NationalityPakistani DomicileMALAKAND ReligionIslam
Date Of BirthMar, 13,1983
GenderMale Marital StatusMarried Desired employment/ occupational fieldB.Sc Electrical Engineering
Objective
Objectives1: Seeking a challenging position of my field in an excellent organization to work and solve the problems. 2: To play a positive and active role in upholding the society. 3: To seek employment in a well-reputed organization where I can grow on my abilities, qualifications, thereby, commit to its excellence. 4:Looking for a rewarding career in reputed organization, which offers both professional and personnel growth and as well as I will contribute in growth of that organization
EDUCATION
B.Sc (Electrical Engineering)
Session2004 - 2008 Title of Qualification awardB.Sc Electrical Engineering UniversityCecos University Of Emerging Sciences & IT Peshawar MARKS Division
Pakistan Engineering Council Regis #71% 1st
ELECT/ 26296
MAJOR COURSES STUDIED Power Generation TransmissionDigital logic designComputer Networks Electrical Machines (AC, DC)Digital signal ProcessingElectronics (Analog, Digital) Electrical CircuitsData CommunicationWireless communication Control Systems Engineering Telecommunication Micro controller (8051)Probability and random variables Antenna Theory Microwave engineeringStrength of Material Mobile Communication
EDUCATION Intermediate (F.Sc)
Session2002-2003 Title of Qualification awardF.Sc Principle subjects/Occupational skills coveredPre-Engineering School/BoardMalakand Public school & college Dargai Division Marks1st (740/1100 )
EDUCATION Matric (S.S.C) Session1999 Title of Qualification awardMatric Principle subjects/Occupational skills coveredScience School/BoardGovt. High School Dargai
PROJECTS
TitleMVSS(Mobile Video Surveillance System) DescriptionHardware Implementation With Micro controllers And Software Implementation With VB. The aim of this project is to develop a wireless system that works on GPRS technology. Type Of projectFinal Year Project InstitutionCECOS University Peshawar
TitleD.C motor Control DescriptionI Have done project of Electrical appliances control using computer as a mini project. In this project D.C Motor was controlled by H-Bridge using MOSFET using C Programming. Type Of projectSemester Project InstitutionCECOS University Of Emerging Sciences & IT Peshawar ADDITIONAL COURSE Year2006 Title of qualification awardedMatlab DurationSix Months InstitutionCECOS University Of Emerging Sciences & IT Peshawar
WORK EXPERIENCE: Hydro Tech Pak. (Pvt) Ltd. (MALAKAND III HYDEL POWER STATION DARGAI Owned By: Sarhad Hydel Development Organization (SHYDO) Government of N.W.F.P Pakistan): From 15 Feb 2008 till to date.
Recently, I am working as an Assistant Plant Manager (Operation & Maintenance) . It is the First provincial hydel project, which deliver 81 MW active powers to National Grid. Having realized the uprising requirements in the field of design, engineering, procurement, construction supervision, operation and maintenance of hydropower and other renewable energy projects in Pakistan, the Hydro Tech Pak (Pvt.) Ltd. comprising renowned hydropower professionals, was founded. It is the first ever-private company of its kind, established in Pakistan for production and development of electric power in Pakistan. Major Responsibilities: Hand on Practical Experience to start Unit for Commercial Generation under normal and emergency situations. Also to stop Unit under emergency situations such as tripping of Power Transmission Lines, Over-loading of Power Transformers and Units, when Distance and Differential Protection operates, Over-speeding of Units, Vibration exceeding its limit, Over Temperature of Stator Coils, Guide Bearings. To change the load (MW/MVar) as per requirement of NPCC, System constraints and water availability. To Pressurize and Depressurize the Governor System for access of maintenance work under permit. Monitoring, acknowledging and identifying Power Plant, Switchyard and Forebay abnormalities through SCADA at Central Control Room. Complete command on MMS (Maintenance Management System). Writing Station Log, preparing trouble reports, issuing SP Tag, requesting and issuing PTW through software based MMS. Energizing the auxiliary system through Power Transformer from Switchyard in case when the Plant Units are Standstill, during emergency shutdown or When the Unit is under Permit for necessary maintenance work. Also to restore the auxiliary Power System during normal running of Units. Watering of Units through Unit - Unit (draft tube valves), From Penstock Upstream watering valve and Spiral Case downstream watering valve. Dewatering of Unit through its Draft Tube valve using the dewatering pumps at drainage pit. Watering of Penstock through its bypass valve and dewatering through its Penstock dewatering valve/rolling the Unit on SNL (Speed No Load).
Monitoring Indoor Units:
Main Systems (32MVA Generators & Transformers, Governor System, Excitation System, Vertical Reaction Type Francis Turbines, Draft Tubes and its Gates). Auxiliary Systems ( Power Line Carrier, LT (415V) & HT (11kV) Switchgear, Brakes Air System, Air Compressor System, Fire Fighting System, Cooling Water System, HVAC System, Drainage & Dewatering System, Battery or UPS System). Generator Differential Protection Relay (24G).
Monitoring Outdoor Units: 132kV Switchyard Breaker and Half Scheme, Operation of SF6 Breakers, monitoring the Breakers Pressure and report if abnormality or alarm appears. To look after the Power Transformer Oil and Winding Temperatures. Forebay, Penstock, Spillway, Sediment Excluder. Supervision & controlling of whole Power House Through SCADA. Operating & Monitoring all plant systems and equipments with the standard operating procedures. Super visioning of maintenance works in Power House. Making sure that all necessary information flows smoothly across and outside the organization. Controlling all equipments in Power Plant and Switchyard through SCADA system and manually in order to operate smoothly the Power Plant and 132KV Switchyard. Managing and recording Trouble Reports ,SP Tags , PTWs(Permit to work ) ,Daily generation sheets and Station Log on MMS (Maintenance and Management system). Identifying abnormality and Faults,isolating it from healthy system and Rectifying Faults . Working independently on operation of Power Plant and 132KV Switchyard at 81MW Malakand.-III Hydro power station. Working & hand on Experience on MMS (Maintenance and Management system). Identifying and Rectifying Faults.
PRACTICAL TRANING: Worked as an Trainee Engineer [at] Hydro Tech Pak.(Pvt) Ltd. MINI PROJECTS AND STUDIES 1)Study Project On Power Generation ( Forbay, Penstock, Spillways & Indoor Units of Power house). 2)Study Project On SCADA (Supervision, Control And Data Acquisitions). 3)Study Project On MMS (Man Machine Interface). 4)Study of Gas Turbines, Gas Engines, Steam Engines, Diesel Engines, Boilers at Nishat Group of Textiles and industries Sheikhopura Pakistan.
ORGANIZATIONAL SKILLS Organizational skillsI along with other boys organized a student welfare society (SWS) by the formal approval of university administration and worked as head of wings of the society for one year.
I have participated in the Seminar on Telecommunication Engineering (Wireless Communication) at CECOS University Peshawar.
COMPUTER SKILLS AND PROGRAMMING LANGUAGES Windows 98,2000,Xp,/NT/XPHARDWARE/SOFTWARES InternetMS OFFICE
LANGUAGES:
FLUENT IN ENGLISH, URDU AND PASHTO
REFERENCES: 1)Mr.Zahid Gul Director General Hydro Tech Pakistan. +92-091-5255201 +92-332-9240560 2)Mr Abdur Rehman DPM(Operation).NPCC +92-346-5558811 3)HAJI AMIR WAHID (PLANT MANAGER HYDRO TECH PAK) +92-932-331045 +92-03339888153
|