Bill Eichinger 536 S. Ridge Dr. Olathe, KS 66061 Cell: (913)-748-7716 Email: snowsing2000[at]yahoo.com
SUMMARY: Further my experience and diversity working with Mobile Crane operations. My experience includes six months in Antarctica on the only Sea Ice Runway in the World, over one-and-a-half years on Wind Farm projects, six months on the Light Rail DART project, and two years within a Waste Management Project in Dallas, TX. I have also been a member for eleven years with the Operating Engineers Local 101 of Kansas City, MO.
EXPERIENCE: 2009 - Mobile Crane operator C P Buckner Crystal Lake, IA. Heavy lift operator on LIEBHERR LR 1400/2 161' Main with 161' Heavy Luffer and LIEBHERR LR 1400/2 258' Main with 58' F1 Jib. Installed G.E. Wind Turbine components for Top out. Operated LIEBHERR 1200 SX 212' Main Boom for Installing DTA's and Base-Mid tower sections. C P Buckner Riceville, IA. Heavy lift Operator on LIEBHERR LR 1400/2 161' Main with 161' Heavy Luffer. Operated LIEBHERR LR 1400/2 278' Main with 28" Wind Tip. Operated LIEBHERR LR 1400/1 185 Main with 138' Light Luffer Replacing Vestas gearboxes. Bay Ltd Texas City, TX. Operated TEREX 80 ton R/T at Valero Refinery. Offloading and loading Heat Exchangers on the wash rack. TWIC card for refinery work.
2008 - Mobile Crane operator C P Buckner - Riceville, IA., Story City, IA., and Ashtabula, ND Heavy lift operator on a LIEBHERR LR 1400/2 161' Main with 161' Heavy Luffer. Operated a LIEBHERR LR 1400/2 278' Main with28' Wind Tip. Installed Vestas Wind Turbine components in Riceville, IA. Operated LIEBHERR LR 1400/2 258' Main with 58' F1 Jib installing G.E. Wind Turbine Component's in Story City, IA. Operated LIEBHERR LR 1400/2 258' Main with F1 Jib installing G.E. Wind Turbine components. Operated LIEBHERR LR 1400/1 185' Main with 138' Light Luffer at Ashtabula, ND. Wanzek Construction Inc. Harris, IA. Operated TEREX 120 ton R/T making Dual lifts Offloading CLIPPER Wind Turbine components.
2007 - Mobile Crane operator Archer Western-Herzog Dallas, TX. Operated Gove 50 ton R/T and LINKBELT 65 ton R/T. Lifting concrete forms and rebar for Shear Keys and Diaphragm's pouring concrete. D H Blattner and Sons, Peetz, Co. Langdon, ND. Operated LINKBELT 75 ton R/T, Grove 75 ton R/T, Grove 90 ton R/T, Grove 130 ton R/T, and TEREX 80 ton R/T. Worked on Offloading G.E. Wind Turbine Component's and setup DTA's. Worked Top out and Base-Mid Installation's of Wind turbine Component's. Aerotek, Peetz, Co. Operated LINKBELT 75 ton R/T, Grove 75 ton R/T, Grove 90 ton R/T, Grove 130 ton R/T, and TEREX 80 ton R/T. Worked on Offloading G.E. Wind Turbine components, and Installing DTA's. Worked top out and Base-Mid Tower section's installations.
2006 - Mobile Crane operator Raytheon Polar services McMurdo, Antarctica Built a Runway on Sea Ice. Operated Cat 950 with snow blower, Cat 966 with 6- way blade, D6D, D7N, and D8R on runway. Operated D9N and Cat 980- loader for maintenance of various projects for National Science Foundation research projects. Certified Crane Inspection and Certified CCO on Grove 75 ton R/T, Mantis 40 ton Crawler Hydro, and P[at]H Truck Crane 70 ton for ship offloading of cargo.
|