2013 Cherry Creek Road Home# 1-502-265-1081 Lagrange, Kentucky Cell# 1-828-467-5743 40041 Email: whoilman[at]aol.com
DAVID WILLIAM HOILMAN
Dear Employer,
I am a married 33 year old father of two looking to further my carrier in the power industry. I have been working in the power industry since 1995 with Turbine Generator Maintenance and Mitsubishi Power Systems. I have had the privilege to work on and manage the construction and maintenance on many types of steam and gas turbines. I would like the opportunity to tell you more about my experience and how my skills could contribute to the successful day to day operation of your company.
Sincerely,
David Hoilman
David William Hoilman Objective To continue my career in the steam and gas turbine industry with a company where I can utilize my extensive knowledge of steam and gas turbines to benefit the company as well as myself in a long term working relationship. EducationAugust 1991 to June 1995 Mitchell High School Bakersville, NC Required courses / Drafting 4/ Industrial Maintenance 4/ Advanced Mathematics. Summary ofSeptember 7, 2008 to present Bechtel Power Corporation QualificationsPosition: Steam Turbine Field Engineer Qualifications consist of engineering assistance to multiple disciplines such as mechanical, piping and electrical. Directed personal in meeting cost and time schedules. Verified material, equipment and quality and assured all results meet design requirements. Managed the installation of a 750 mw Hitachi steam turbine and auxiliary equipment.
November 6, 2008 to September 7, 2009 Becon Construction
Position: General Foreman Qualifications consist of management of the installation of a 750 Hitachi steam turbine. Insure craft preformed work properly and efficiently. Daily, weekly and scheduling.
November 1, 2007 to November 4, 2008 Mitsubishi Power Systems Position: Field Service Engineer Qualifications consist of Project Management (Up to 3 projects at a time), Supervision of maintenance crews (from 10 to 50 personal at a time). Outage planning, Job cost management of large steam and gas turbine outages. I have experience on various types of machines such as General Electric, Westinghouse, Elliott, Mitsubishi, ABB, ABB Vacs, Allis Chambers, Dresser Rand, Terry Turbines, Worthington, Toshiba and Fuji. January 14, 2004 to November 1, 2007 Turbine Generator Maintenance Cape Coral, FL
Position: Technical Director Qualifications consist of Supervision of maintenance crews (from 10 to 20 personal at a time). Outage planning, Job cost management of large steam and gas turbine outages. I have experience on various types of machines such as General Electric, Westinghouse, Elliott, Mitsubishi, ABB, ABB Vacs, Allis Chambers, Dresser Rand, Terry Turbines, Worthington, Toshiba and Fuji. 1995 to 2004 Turbine Generator Maintenance Cape Coral, FL Position: Turbine Mechanic Qualifications consist of daily maintenance on steam and gas turbines, tight wire alignment, coupling alignment etc.
Experience Advanced project management skill Advanced computer skills Advanced leadership and management skills Advanced outage planning skills Excellent job cost management skills Great customer relationship skills Extensive knowledge of steam and gas turbines
Training NC State certified EMT-I Mayland Community College OSHA 301 Safety Training Turbine Generator Maintenance ERAC Electronic Diaphragm Alignment Turbine Generator Maintenance Cost Management 40 hour course Mitsubishi Power Systems Basic Controls Systems Mitsubishi Power Systems Turbine Tools Version 2.1 Surtrac Version 2.0 Microsoft Office Systems Programs Basic Thermodynamics
Languages English and Spanish Summary I have been working in the power industry since 1995. I have worked in many different facilities such as paper mills, refineries, trash burning facilities, fossil plants, co-generation facilities, chemical plants, mining facilities, carbon plants, large saw mills, power stations and new construction sites.
On The Job Experience Steam Turbines; Toshiba 350 MW New Installation Hitachi 750 MW New Installation GE 45 MW Hydrogen Cooled Major Overhaul GE 140 MW Hydrogen Cooled Major Overhaul GE 35 MW Hydrogen Cooled Major Overhaul GE 30 MW Hydrogen Cooled Major Overhaul GE 20 MW Air Cooled Major Overhaul GE15 MW Air Cooled Major Overhaul GE 10 MW Air Cooled Major Overhaul GE 8 MW Air Cooled Major Overhaul GE 5 MW Air Cooled Major Overhaul GE 3.5 MW Air Cooled Major Overhaul GE 2.5 MW Air Cooled Major Overhaul GE 1 MW Air Cooled Major Overhaul GE 1500 MW Combined Cycle Major Overhaul GE 1200 MW Combined Cycle Hydrogen Cooled Generator (New Installation) GE 50 MW Hydrogen Cooled Major Overhaul GE 500 MW Hydrogen Cooled Major Overhaul Westinghouse 550 MW Hydrogen Cooled Major Overhaul Westinghouse 130 MW Hydrogen Cooled Major Overhaul GE 60 MW Hydrogen Cooled Major Overhaul Westinghouse 80 MW Hydrogen Cooled Major Overhaul Westinghouse 75 MW Hydrogen Cooled Major Overhaul Westinghouse 60 MW Air Cooled Major Overhaul Westinghouse 50 MW Air Cooled Major Overhaul
Steam Turbines Continued;
Westinghouse 75 MW Hydrogen Cooled Major Overhaul Westinghouse 60 MW Air Cooled Major Overhaul Westinghouse 50 MW Air Cooled Major Overhaul Westinghouse 30 MW Air Cooled Major Overhaul Westinghouse 15 MW Air Cooled Major Overhaul Westinghouse 13 MW Air Cooled Major Overhaul Westinghouse 5 MW Air Cooled Major Overhaul Elliot 20 MW Air Cooled Major Overhaul Elliot 12 MW Air Cooled Major Overhaul Elliot 10 MW Air Cooled Major Overhaul Elliot 13 MW Air Cooled Major Overhaul Elliot 5 MW Air Cooled Major Overhaul Mitsubishi 185 MW Air Cooled Major Overhaul Mitsubishi 85 MW Air Cooled Major Overhaul Mitsubishi 60 MW Air Cooled Major Overhaul Mitsubishi 50 MW Air Cooled Major Overhaul Mitsubishi 45 MW Air Cooled Major Overhaul ABB 60 MW Air Cooled Major Overhaul ABB 80 MW Vaxx Unit Air Cooled Major Overhaul ABB 50 MW Air Cooled Major Overhaul Allis Chambers 150 MW Air Cooled Major Overhaul Allis Chambers 50 MW Air Cooled Major Overhaul Allis Chambers 20 MW Air Cooled Major Overhaul Dresser Rand 25 MW Air Cooled Major Overhaul Dresser Rand 15 MW Air Cooled Major Overhaul Dresser Rand 6 MW High Speed Air Cooled Major Overhaul Fuji 60 MW Air Cooled Major Overhaul Fuji 40 MW Air Cooled Major Overhaul Delaval 150 MW Air Cooled Major Overhaul Frank Otosie 25 MW Air Cooled Major Overhaul Toshiba 350 MW Hydrogen cooled Generator (New Installation) Worthington Line Drive Turbines Terry Turbines Air Cooled and Hydrogen Cooled Generators
Combustion Turbine;
GE Frame 5 Turbine and Generator Major Overhauls GE Frame 6 Turbine and Generator Major Overhauls GE 7 EA Turbine and Generator Major Overhauls GE 7 FA Turbine and Generator Major Overhauls Westinghouse 251b10 Turbine and Generator Major Overhauls Mitsubishi 501 F Turbine and Generator Major Overhauls
ReferencesAvailable upon request
|