John W. Stultz II, P.E. Profile Project Manager with 13 years experience in estimating and managing commercial projects, including owner-direct. Managed both design/build, plan/spec, and performance contracts with union field personnel. Experience 2006 PresentACCO Engineered SystemsSan Leandro, CA Project Manager/Account Manager Building Service Division Managed account base of $600,000 oBank of the West 100 branches including main headquarter buildings and data center (Annual maintenance contract of $176,000 / Pull-through of approximately $350,000 - $450,000) oMorgan Stanley 4 data centers (Annual maintenance contract of $80,000) Owner-direct, design/build turn-key projects o901 Battery Street Design/build replacement of built-up rooftop system. (Project Size $600k) oFDIC Turbocor retrofit to 250 ton Trane chiller including R-134a conversion (Project Size $500k) oBayfair Shopping Center Design/build replacement of rooftop AC core system and installation of 450 ton supplemental chiller, along with smoke/exhaust system integration (Project Size $1.6 million) oCity of San Ramon Multiple building AC replacement including custom multizone units (Project Size $900k) Performance contracts with ESCO partners oChevron/CSUEB Performance Contract retrofit converting constant volume mixing boxes to VAV, hot and chilled water system modifications for energy savings (Project Size $1.48 million) oAECOM/SFSU Performance Contract retrofit of existing rooftop air handlers, installation of new heating hot water piping system/heat exchanger and VAV installation for faculty offices (Project Size $2.14 million)
1996 2006ACCO Engineered SystemsSan Leandro, CA Project Manager Project Group/Construction Work with General Contractors Design/build projects oUC Davis CCAH/CCG Two story VAV/reheat system with independent Phoenix lab control system for research area and animal holding (Project Size Mechanical $1.7 million / Plumbing $700k) oFairmont Hotel Renovation of entire hotel suites with 4-pipe fan coils on vertical risers, central plant replacement of 800 ton chiller and 850 ton absorption chiller, and Crown Room with multiple Value Engineering (VE) options (Project Size $5.6 million) oThe Shops at Tanforan Full renovation of two-story, 460,000 sq.ft. mall with installation of 1600 ton water-source heat pump system serving mall common area and first floor tenants. oHines / 101 California Replacement and relocation of 40 story high-rise outside air system from basement to 7th floor (Project Size $770k) Plan/spec projects oHines/Pleasanton Corporate Commons Five story Core and shell of buildings B, C, and D (Project size $4.5 million) Lab Control, Cleanroom, and MOB projects oUCSF Parnassus Six story vivarium utilizing Tek-Air lab system (Project size $7.1 million) oPAMF / Sutter Health Dublin Three story core and shell with two floors full tenant improvement for MOB. oLawrence Livermore National Labs (NIF Project) Optics Assembly Building CSP5 Installation of over 1600 HEPA filters with custom air handlers for Class 10,000, Class 1,000 and Class 100 clean rooms (Project Size $3.1 million) Estimate/Sale/Manage/Close Projects Mechanical Estimating / Fastpipe Pipe estimating / Sheetmetal Estimating
1995-1996Linford CompaniesOakland, CA Project Engineer Estimating Support for Projects Load calculations, Duct & Pipe Sizing, System selection AutoCAD/Comply-24 Analysis/Microsoft Project/WENDES Duct Estimation
1992-1995Glumac & AssociatesSan Francisco, CA Mechanical Engineer Engineering Design for new construction and tenant improvements (TI) Load calculations (Trane/Carrier), Duct & Pipe Sizing, System selection Energy Analysis of Systems Education 1987 - 1992California Polytechnic State UniversitySan Luis Obispo, CA Bachelor of Science - Engineering Technology Air Conditioning & Refrigeration Professional Associations Registered Professional Engineer, State of California License #M30454 LEED Accredited Professional (LEED AP)
Additional Project Examples Fashion Fair Mall, Fresno, CA Replacement of mall common area system, Project Size $1 million USF Kendrick Hall, San Francisco, CA Renovation of 5 story law building, Project Size $1.51 million USF Fromm Hall, San Francisco, CA Renovation of existing Hall, including HHW radiant floor system Hacienda Lot 1F, Pleasanton, CA Design/Build 2-story VAV/reheat Hacienda Lot 35B, Pleasanton, CA Design/Build 2-story VAV/reheat, with full TI building out for Polycom Total project size $700k Life Chiropractic College, Hayward, CA Renovation of two-story central plant built-up DX system with installation of 53 new rooftop package units for multiple classrooms. Project Size $900k St. Francis Hospital, San Francisco, CA OSHPD renovation of 2nd floor, Mechanical, process piping Pacific Commons, Fremont, CA Installation of multiple retail store complex, Project Size $900k 1080 Marina Village Parkway, Alameda, CA Four story VAV/reheat with multiple units serving common riser application Alameda County Juvenile Hall, San Leandro, CA Renovation of multiple buildings with new AC units, security ceiling and grilles National Center for International Schools, San Francisco, CA Renovation of existing school Raychem, Menlo Park, CA Multiple industrial exhaust projects for manufacturing facility
|