Field Superintendent
Welder Objective:Field Superintenden for McBurney . Corp. from 1985 to 2008 Various projects for McBurney Power Services including construction of new facilities;, repairs to existing facilities; rebuilds of existing facilities; and numerous shut-down jobs of all types. 2007-2008 McBurney Corp. Fordyce, Arkansas worked in McBurney Branch office in Fordyce, Ar. Layed off 1/6/09 Qualifications:2006-2007 United States Sugar Corp.- Clewiston, Fl.: Construction Supt. Construction of Sugar Process Plant largest in USA. 2005-2006; Some small shut-down and repair projects in USA 2004-2005; Electrowatt-Ekono Thailand Ltd- Pichit, Thailand; Construction/Advisor for (1) 200,000 PPH boiler for 20 MW Power Plant. 2004; Blue Ridge Paper, Canton, Nc.; Supervised retrofit of coal burners, feeders, and controls for coal fired boiler. 2003; Proteus Power Co., Guayquil, Ecuador; Construction/Advisor to replace refractory in (2) oil fired power boilers. 2002; Ambro S.A.,Suceava, Romainia; Construction advisor for installation of 20 TPH HRT wood waste fired boiler. 2001-1999; Energia Verdia, San Francisco, Mostazal, Chile; Construction advisor for complete installation of 20 TPH HRT boiler system also for complete construction of 25 TPH HRT boiler and fuel system. 1997-1998; Appleton Estates Sugar Plant and Rum Distillery, Appleton, Jamaica, W.I.; Construction advisor for the rebuilding/retrofit of (2) 75,000 PPH field erected bagasse fired boilers and (1) 60,000 oil fired package boiler. 1994;Hunt-Wesson, inc., Savannah, Ga, Installation of food processing equipment, piping, foundations and setting of (3) oil tanks. 1994; Louisiana Pacific Corp., Bernice, La; Complete rebuild of (3) HRT boiler furnaces and retube of (2) boilers. Education Attended Fordyce Public School, Fordyce, Arkansas 1965- Welding School- Arkansas Reference upon request: Relevant Experience; Continue from Qualifications; 1994; Sugar Cane Growers, Co-Op, Belle Glade, Fl.; Completely retubed a 150,000 PPH boiler. Federal Paper Board, Newberry, Sc.; Installation of new scrubber and ductwork. 1993; Hunt Plywood Co., Inc., Pollock, La.; Installation of Package Boiler and modifications to fuel system and completely retubed oa HRT wood fired boiler. 1992; Okeelanta Corp., Okeelanta, Fl.; Installation of 150,000 lb/hr Package Boiler, piping and controls. 1991; Okeelanta Corp., Okeelanta, Fl., Wood Yard installation of conveyors and wood hog. THE McBURNEY CORPORATION 1987-1988; Pyro Power, Ames, Ia., Field Superintendent-construction of fluidized bed coal fired boiler, Iowa State University. 1986-1987; General Electric, Biddeford, Me: Field Supt.- construction of (2) power boilers, household garbage, fuel fired. Continue on other experience; Other Experience 1986-1985; International Paper, Selma, Al.; Construction of wood fuel handling system for a 400,000 PPH boiler system. 1970-1985; Sisson Welding & Construction Co.; Dry Kiln Construction-Sawmill Construction; Self Employed. 1968-1970; Russell Dry Kiln Co., Fordyce. Ar.; Dry Kiln and Sawmill Construction Worked as a Foreman. 1966-1968 worked as welder. 1965-1966. Bobs Welding Service, Fordyce, Ar.; Welder 1963-1965; Plastics Mfg. Co., Dallas, Tx. Equipment Operator 1962-1963; Fordyce Lumber Co., Fordyce, Ar. 1959-1962; U S NAVY -- MCBURNEY YEARS OF EXPERIENCE; 23
|