Jeff Ryan, REM
Summary of Accomplishments Created over $100K annual savings by replacing service contracts with T&M Supplier of Choice contracts. (STMicrolectronics) Worked with flooring company to remove chemicals from the vulcanizing process, producing a no-odor product. The manufacturer reduced the cost of a large project by 50% in gratitude. (STMicrolectronics) Designed and built an acid nuetralization system that enabled the company to meet City industrial waste permit requirements and saved in excess of $75K (RF Monolithics) Professional Experience STMicroelectronics Carrollton, Texas 2000 to Present Facilities Services and Finance Manager
Administering construction projects, building maintenance, and 24x7 operability of a 65-acre site consisting of 11 buildings, comprised of cleanrooms, mechanical spaces, and administration and executive areas. Manages annual facilities maintenance budgets in excess of $55M, and large-scale capital projects. Negotiates and manages electricity and natural gas procurement contracts, exceeding $15M annually. Created and implemented a Facility Service Call system. Created Work Place Formulas detailing furniture and finish standards. Improved site security level to the point that there were zero car thefts in the past four years. Previously an average of three thefts occurred per year. RF Monolithics Inc. Dallas, Texas 1993 to 2000 Facilities and EHS Manager 1995 to 2000
Managed the construction, maintenance and daily operation of a two-building complex, consisting of wafer fabrication cleanrooms, component assembly cleanrooms, final test lines, administration and executive areas. Created mechanical design for Class 1000 clean rooms that were built at $100/ft less than typical. Obtained all required permits, negotiated contracts and oversaw all phases of the construction project. Maintained company compliance to all applicable federal and state regulations. Managed the safety and security services. Specified, installed and managed the Facility Monitoring & Control System (FMCS). Manager Technical Support Group 1993 to 1995 Oversaw the design, specification, procurement, installation and maintenance of all wafer processing, component assembly and final assembly equipment. Created a Technical Support Group (TSG), taking it from a five-man repair and maintenance department to a team of 20, operating 24 hours a day. Specified and implemented a Computerized Maintenance Management System (CMMS), streamlining all aspects of preventative maintenance and spare parts inventory.
Jeff Ryan Page 2
Zenith Microcircuits Division. Reynosa, Mexico 1990 1993 Engineering and Technical Support Group Leader Supervised the manufacturing of Surface Acoustic Waveform (SAW) devices, primarily for the television industry. Also manufactured hybrid solid-state relays as a sub-contractor for International Rectifier. Managed a diverse workforce of production line personnel who produced 500,000 units per month with minimal automation. Managed a staff of eight engineering technicians who repaired and maintained all assembly equipment. Improved production yields by constructing a new assembly area and instituting new process techniques. Created comprehensive training programs for all new production line staff. Education International Facilities Management Association Certified Facilities Manager (CFM) In progress Leonard Hawes Real Estate Real Estate (Realtor) License North Lake College - BOMI Design, Operation, and Maintenance of Building Systems Association of Facility Engineers National Registry of Environmental Professionals Registered Environmental Manager (REM) H.M.A.S. Nirimba / Sydney Technical College Royal Australian Navy Bachelor of Science - Weapons Electrical Engineering
Recognition City of Carrollton 2008 Environmental Distinction Award Community Volunteerism Schreiber United Methodist Church Member Finance Committee
|