242 Silver Fox Trial Dallas GA770-369-4832 ecarlos33157[at]yahoo.com Carlos Escobar ObjectiveSuperintendent Experience2006-2008Catalfumo Construction West Palm BC FL Project Superintendent Constructed a 7 story office building with a parking garage. Superintendent in charge of schedule, site logistic, quality control, block, plastering, concrete, cables, rebar, civil work, landscaping, MEP, RFI. Project Schedule: 15 months substantial completion 12-5. Project Milan cost : 20 million dollar project. Aventura constructed two high rise finished club house finished structure. 2002-2006Pavarini ConstructionMiami FL Superintendent Constructed two five story buildings ocean front condos on a multi high rise project 360. In charge of quality control, auger piles, concrete, cables, rebar, block, doors, window, MEP, RFI, ordering pump and concrete complete interior and shell work. Jade of Brickell of Miami In charge of structural concrete, rebar, cables, pumps, block, inspections. 1993-2002Miller & SolomonMiami FL Superintendent Constructed a multi condo complex with a parking garage 18 below water table Down Town Dadeland In charge of removing 500 thousand yards fill, auger cast piles, water pumps sediment water tanks, dive team, pumps, excavation crew, sheet pile crew, pouring concrete tremie underwater, and two buildings from structure to interiors, MEP, Peninsula # 2 High rise condos in Aventura bay. Superintendent in charge of concrete, pumps, auger piles, cables, rebar, block, site logistic, store front window. Peninsula # 1 High rise condos in Aventura bay. Structural Superintendent in charge of concrete, cables, rebar, pumps,
1987-1993K&J ContractingFlorida city Supervisor North Side Fire Station constructed shell work footing, block work, tie beams, concrete columns, joist system, concrete pumps, layout, slabs, quality control and manage subs. Elementary School constructed footings, block work, tie beams, slabs, pumps Concrete, rebar, equipment, concrete joist, subs, layout, quality control. Miami Dade Community Collage constructed addition four story building tie beams, elevated slabs, concrete columns flat work.
EducationHigh School Diploma 10 osha card valid Accredited Program for Construction Atlantic University FL Two year Associate Degree Project ListCatalfumo Construction Milian Aventura condos high rise Pavarini 360 high rise condos Jade of Brickel. Miller & Solomon: Downtown Dadeland Peninsula #1 & #2 K&J Contracting: North Side Fire Station Elementary School Hialeah References Excellent professional references and letters of recommendation available upon request.
|