WILBERT J. McGUIRE
P.O.BOX 584 PRINCETON IL. 61356 Phone: (815) 875-2021 Email: wilbertmcguire1[at]msn.com Cell: (502) 514-2845
CERTIFICATIONS: NCCER pipe fitter, ASME 1X pipe welder, Millwright, Design Draftsman, MSHA ID # G-173,
QUALIFICATIONS 1. Planning, schedule, control, and on-time completion within budget. 2. Detect signs of opportunities of motion economy that will increase your workers productivity. 3. Measurement before control. 4. Building a good customer service relationship. 5. Optimum crew size using a representative crew method in a safe way. 6. Schedule control points in timely manner...
EDUCATION 1972-1976Graduate, Hardaway High, Columbus Ga. 1976-1978Design Drafting, Columbus Voc. Tech., Columbus Ga.
EMPLOYMENT 2007-2008Journeyman pipe fitter foreman, PRIME MECHANICAL. Steam piping, carbon, pipe to 8. Fabricate from isometric drawing, install on elevation and co ordinance.
2006-2007Millwright/pipe fitter, Artisan Mechanical Facility maintenance of NAS. - North American Stainless pipefitting on new construction and maintenance. Millwright on shut downs; combination man pipe fitter, welder. Millwright, rough and precision machine setup...
2004-2005Jobsite Supervisor, Centerpoint and Ashutosh LLC. Work assignments, time sheets, shot elevation for underground plumbing and pipe, blue print reading, check workmanship and materials provided comply with all drawing and specification. This included but not limited to, sanitation, fire protection, plumbing underground and above ground, and HVAC piping. Ashutosh LLC. Commercial building 38,000 sq. ft.had to bring project that was in trouble under control and on schedule. Got seal for building. Was sent to Jersey to finish 58,000 sq. ft building.
2002-2004 Owner, M&W Mechanical Sub-contractor for Consolidate Construction wrote contacts for HVAC piping, fire protection piping, pumps, steel erection, and supervisor. Often called as consultant on other Consolidated projects. Keep five people on payroll. Wrote contracts, proposals, did job estimation, time sheets and payroll.
1999-2001 Pipe Supervisor, Consolidated Construction Job takeoffs, time sheets, blueprint reading, oversee crane operations, job layout, job estimation, machine set up, pipe fitting, pipe welding. Projects from 1million to 2.5 million. Supervised 25 men with subcontractor... 1998-1990 Temporary jobs. Shut downs and short term jobs Hays Mechanical, Spartan construction, Brown and Root, Kamtex, Elliot Machine Works, Watkins, MSI Inc.
1989-1990Pipe foreman, Phoenix Mechanical Time sheets, job layout, blue print reading, pipe fitting, welding. Crew of 15 men on 1 million dollar project
1985-1989 Working foreman pipe fitter, Smith Raymond Pipe fitter with helper did small job carbon steel, copper, pvc, from shop drawings.
1980-1985 Millwright Foreman, Glenn & Wright Machine set up, heavy rigging, iron work, foundations, sheeting, pipe fitting, job layout, blue print reading. Crew of 20 men.
|