Job Title Project Manager
Relocation Preferences : Anywhere in the World
Objective : Achieving the Goals at every stage in the career and reaching to the Top Management level by means of Hardwork, Sincere effort, Determination and being loyal towards work and company.
Resume :  
CURRICULAM VITAE
Permanent Address:
Satish Kumar EmandiPhone : +91-891-2792963
S/o. E.V.Ramana RaoEmail : satish23_e[at]yahoo.com
#51-8-41/2, Behind Eenadu,
Seethammadhara,
Visakhapatnam 530 013
Andhra Pradesh, India

NAME:SATISH KUMAR EMANDI

FATHER NAME:E.V.RAMANA RAO

NATIONALITY:INDIAN

DATE OF BIRTH:22-05-1977.

MARITAL STATUS:MARRIED

PASSPORT DETAILS:Passport Number: G7105984
Date of Issue: 11.04.2008
Date of Expiry: 10.04.2018
Place of Issue: Visakhapatnam.

E-Mail:satish23_e[at]yahoo.com

EDUCATIONAL QUALIFICATIONS:

Bachelor of Engineering (Mechanical) from Bangalore University.1998 with 71.6%.
M.S.Ramaiah Institute of Technology, Bangalore University.

CERTIFICATION:

Under gone training in Operation and Maintanence of Cryogenic Pumps by the Cryomec Service Engineer, Switzerland.

ACADEMIC PROJECTS:

PROJECT #1

An Interactive package for modeling, NC code generation and Simulation for CNC turning and milling.

PROJECT #2

Computer Aided Design and Analysis of Cryogenic Storage Vessel. This Project mainly deals
with the Computer Aided Design and Analysis of the cryogenic storage vessel which is used to
store the Liquid Nitrogen at 196C .The Design calculations and the Basic data has been in
accordance to the A.S.M.E codebook. This project was done at BHPV Ltd., Visakhapatnam.

COMPUTER AWARENESS:

Operating Systems:MS- DOS, Windows- 98/XP/NT.
Very Well acquainted with AutoCAD, MS Office (MS Word, MS Excel, MS PowerPoint)
Well versed with ASME, API and ANSI Standards and Procedures.

RESUME OF EXPERIENCE
PRESENT EMPLOYER
M/s. PETRO ENERGY CONTRACTING SERVICES, SUDAN.
Working as a Project Manager From June 2008 to Till Date.
Present Responsibilities:
Project: Melut Basin Oil Development Project - Upstream Facilities - EPCC of the Field Surface Facilities (Year 2008 2010), 30 Nos.Well Heads Hook up and 5 Nos. OGMs.
Was occupied in Head Office and responsible for Design and Engineering Co-ordination, Procurement expediting, Client co-ordination and Reporting and Planning of the Project. Work involves Sub-contractor Management, Co-ordination between Sub Contractors & Client (Petrodar Operating Company) for the development of the project. Preparing and submitting all the documents as per the milestones. Recruiting the Project Management Staff and Workmen required for the Completion of the project. Finalizing the Sub contractors for the Engineering, NDT Services, CP Services, Project Material Vendors as per the approved list of the client. Partially involved in Estimation and Bid preparation.

Responsibilities: Senior Project Engineer Mechanical from 07 May 2008
Work profile includes controlling the site activities by daily monitoring the progress, Projects Tendering, Estimating the Project details, submitting the Bidding Document, Sending the enquiries to the vendors, comparing the unit rates of the material of different vendors, Total Scope calculation of the project tender, Preparing the material takeoff (MTO) for Piping, Mechanical items, Calculating the piping & pipeline inch dia for shop and field welds.etc. Which are all mechanical related.

Strengths:
Knowledge on effort estimates and budgetary quotations and list of deliverables for the purpose of new proposals.
Experience in Defining project scope and deliverables, develop and refine design specifications, create and execute work schedules and ensure compliance with timelines.
Setting up realistic goals for the team and help them achieved with proper planning process and execution.
Customer facing, Enthusiastic, attitude to work well under pressures of time and delivery.
Good team facilitator and coordinator.

PREVIOUS EXPERIENCE
#1. M/s. SPECIAL TECHNICAL SERVICES LLC. MUSCAT, OMAN.
Worked as a Proposals Engineer - Mechanical from 05 October 2007 to 31 March 2008.

Individually worked out the total Mechanical(Major Part) related Technical & Commercial for MARMUL CENTRAL DEVELOPMENT PHASE 3 AND THULEILAT STATION EXPANSION PROJECT TENDER which is worth of US$70 Million. Client is Petroleum Development Oman (PDO).

Responsibilities:
Work profile includes Projects Tendering, Estimating the Project details, submitting the Bidding Document, Sending the enquiries to the vendors, comparing the unit rates of the material of different vendors, Total Scope calculation of the project tender, Preparing the material takeoff (MTO) for Piping, Mechanical items, Calculating the piping & pipeline inch dia for shop and field welds.etc. Which are all mechanical related.

#2. M/s. RELIANCE ENGINEERING ASSOCIATES LIMITED, INDIA.
Worked as a Manager - Piping from 09 August 2007 to 04 October 2007

Project Location: On Shore Terminal of Oil & Gas Exploration KG Basin, Kakinada, Andhra Pradesh, India
Position & Responsibilities:
Worked as a Manager for Underground Piping (HDPE) for the Construction of the Onshore Terminal of Krishna Godavari Basin.

Work profile includes coordinating with the Contractor (Larsen & Toubro), Conducting weekly review meetings, Total Scope calculation of Shop and Field. Prefabrication of Piping as per the isometrics, Shifting the Fabricated Spools to the site location. Coordinating with Quality control departments of our company as well as the Client for inspection of the joints fabricated.

#3. M/s. AL HASSAN ENGINEERING CO.S.A.O.G., OMAN.
Worked as an Engineer - Piping (Grade - E2P) from 05 July 2007 to 08 August 2007.

Project Location: Aromatics Oman LLC, Sohar, OMAN
Client : GS Engineering Co., South Korea.
Position & Responsibilities:
From 19 July 2007 to 08 August 2007.
Worked as a Fabrication Workshop Incharge for Piping for the Construction of the Aromatics Plant in Sohar, Oman.

Work profile includes Total Scope calculation of Shop and Field. Prefabrication of Piping as per the isometrics, Fabrication of Pipe Supports, Shifting the Fabricated Spools to the site location. Coordinating with Quality control departments of our company as well as the Client for inspection of the joints fabricated. Conducting the Radiography for the joints welded.

Workshop team includes 03 nos. of Junior Engineers, 03 nos. of Mechanical Foreman, 02 nos. of Welding Foreman and 174 nos. of different categories of Workmen.

Project Location: PTTEP - Shams Gas & Condensate Development Project, IBRI.
Client : Hanover Company (Middle East) LLC.
Position & Responsibilities:
From 05 July 2007 to 18 July 2007.
Worked as an Engineer - Piping of Grade E2P for the activities involved before Shutdown of the Plant and after Shutdown.

Involved in the replacing and modification works of the Piping and Equipments. Coordinating with the Client and my foreman for the completion of the scheduled work as per the target date. As an Engineer I handled almost 04 nos. of Junior Engineers, 12 nos. of Mechanical Foreman and 280 nos. of workmen of different categories.
Completed the Shutdown maintenance works successfully as per the schedule satisfying the HSE requirements.

#4. M/s. LARSEN & TOUBRO LIMITED., (ECC DIVISION), INDIA.
Worked as an Officer - Mechanical (Cadre - O1) from 12 June 2006 to 19 June 2007.

Project Location: South Asia Liquefied Petroleum Gas (Under Ground Storage), Visakhapatnam.
Client : Hindustan Petroleum Corporation Limited (Visakh Refinery), Visakhapatnam and TOTAL Fina - France.
Position & Responsibilities:
From 18 December 2006 to 19 June 2007.
Worked as an Officer - Cadre O1 - Mechanical for the Construction of LPG Under Ground Storage Tanks of 60,000 Metric Tons capacity. These Caverns are at a depth of 200 meters below from the sea level.
Involved in the execution of Fabrication and Erection of Above Ground Piping and Erection of Rotary pumps in the plant.

Project Location: Reliance Industries Limited, Jamnagar.
Position & Responsibilities:
From 12 June 2006 to 12 December 2006.
Worked as a Senior Engineer - Mechanical (Cadre SUP-A) for the Construction of Reliance Export Refinery Project (Jamnagar Export Refinery Project) of 30 MMTPA capacity.

Involved in the execution of Fabrication and Erection of Above Ground Piping and Erection of Equipments in FCC (Fluidized Catalyst Cracking) Unit.

#5. M/s. AARVI ENCON PRIVATE LIMITED, MUMBAI, INDIA.
Project Location: M/s. Hindustan Petroleum Corporation Limited (Visakh Refinery)

Position & Responsibilities:
From September 2005 to May 2006
Worked as a Construction Engineer for the Sulphur Recovery Unit Integration Project and Excess Oil Ingress Project.

To handle the Contractor, correspondence with our higher Officials regarding queries, clarifications in drawings, to get the things done right time & in right manner to achieve the set targets so as to meet the project schedules by doing proper planning by interaction with Colleagues & Contractors.
Responsible for the complete Erection of Equipments & Fabrication & Erection of Structures. Responsible for Fabrication & Erection of Piping of both Carbon Steel & Stainless Steel at site.

#6.M/s. BGK ENGINEERING AND PROJECTS PVT. LTD., HYDERABAD, INDIA.
The Company undertakes turnkey projects like supply of Vessels, Heat- Exchanger etc. from their Work Shop. Fabrication, Erection, Commissioning, Shutdown & related Piping works, Tanks (like Drying Bottles, Air Water Tower, Nitrogen Water Tower, etc..), Equipments Erection, Fabrication of Structural for AIR SEPERATION UNITS like Nitrogen Plants, Oxygen Plants, Argon Plants, etc.,

Position & Responsibilities:
From May 2004 to August 2005.
Worked as a Piping Engineer in external services and execute Erection works at sites in the following activities and some times at HO preparation of Erection manuals.
1st Site: 2 X 380 TPD Oxygen Plant, Jindal Steel & Power Limited, Raigarh, India.

Daily Progress and Schedule Monitoring.
Fit up & Welding Inspection.
Participate in client and Contractor meetings.
Total Scope Evaluation.
Engineering, Planning, Monitoring, Procurement, Construction Coordinating with other Departments, etc...
Preparation of missing ISO drawings, Valve Platforms& Supports with BOM.
Pre-Commissioning & Commissioning activities.
Executing the work as per the P & IDs.
Preparation of As Built Drawing.
Preparation of RA Bills & Final Billing.
Inspection of Pipeline laying & preparing punch list etc.
Mechanical Clearance and Hydro Testing.

#7.M/s. USHA GOUTHAMI INDUSTRIES LIMITED, HYDERABAD, INDIA.
The Company is a start up Organization and proposed for implementation of a 4 MW Biomass Based Power Project in the Ananthapur District of Andhra Pradesh. The power plant would be based on fuels derived from agricultural and crop residues.

From November 2001 to October 2003:
Worked as a Project Engineer, I was involved in the Fabrication and Erection of Power Plant Piping and involved the Erection and Alignment of Static & Rotary Equipments.

Responsibilities:
Issuing the Isometric Drawings to Fitters.
Checking the Fit up as per the Isometric drawings.
Daily Progress and Schedule Monitoring.
Involved the Erection & Alignment of Compressors, Cooling Water Pumps,
Co-ordinate regarding Engineering, Procurement & Construction matters.
Preparation of as built drawing as per the Site condition.
Preparation of RA Bills.
Inspection of pipeline laying & preparing punch list etc.

#8.SUNKU AUTO LIMITED, MOULA-ALI, HYDERABAD, INDIA.
The Company is acknowledged as the pioneer of Diesel operated 3-wheeler Segment in India, manufacturing vehicles with annual production Capacity of 9000 Auto rickshaws and Goods Carriers. Sunku Auto Limited produces the following models: 3-seater full body, 6-seater full body,
Pick-up van, 5-wheeler load carrier, 3-seater chassis, 6-seater chassis etc.,

From December 1998 to October 2001:
I started of my career in Sunku Auto Limited as a Graduate Engineer Trainee in December 1998 i.e. after the completion of my Bachelors Degree in Mechanical Engineering. During this period I acquired the knowledge of manufacturing process of 3- wheeler Diesel Auto like Fabrication, Engine Assembling, Body Building, Painting, etc.,

Later after successful completion of one year, designated me as a Production Engineer. From then I actively associated with Production and Quality control includes material Testing.

Responsibilities:
Preparing the Daily Schedule of works.
Allocation of works to be done to the workers.
Checking the Fabricated part to the Design specification.
Assembling the parts as the Drawing.
Testing the Materials Tension test, Load test etc.
Daily Progress and Schedule Monitoring.
Inspecting the test reports of the Engine & materials received.
Checking the Quality of the paint before painting is done to the body.
Interacting with the Authorized Dealers of the company.
Sending enquiries to State Government Organizations.
Conducting Performance test before delivery to the Dealer.




Achieving the Goals at every stage in the career and reaching to the Top Management level by means of Hardwork, Sincere effort, Determination and being loyal towards work and company.
---Satish Kumar Emandi





A/E/C executives access six figure construction jobs (construction management jobs), architect jobs, civil engineering job and facility manager jobs. CE lists a variety of construction management positions, construction company jobs and construction vacancies, including civil engineering vacancies, construction engineering jobs, architecture jobs, facility management jobs, construction sales jobs, construction manager jobs, construction engineer jobs, environmental engineering jobs, chief estimator jobs, construction director jobs, president jobs, business development manager jobs, marketing director jobs, senior mechanical engineer jobs, senior electrical engineer jobs, chief engineer jobs, senior interior designer jobs, chief financial officer jobs, safety director jobs, senior structural engineer jobs, facilities director jobs, senior property manager jobs, diversity jobs and facilities management jobs.

Employers view interactive construction resumes, mechanical engineer resume or architect resumes, and research construction job descriptions, construction salaries or civil engineer salaries. Job seekers advance their construction management careers and secure construction manager employment, facilities management employment, and civil engineering employment.