Resume Gene Marsh Post office box 1592 Pell City, Alabama 35125 Phone 205-288-5610 E-mail gmarsh1948[at]aol.com
Summary: Over 23 years progressively responsible project management in large scale projects. And multiple projects with direct reports of project managers Highway, Road, Subdivisions, Dams Sanitary sewer, storm sewer, water, asphalt CAREER/SKILL KNOWLEDGE Cost estimating Permitting process Contract administration Bid/award process Liaison with government, agencies Construction management Plan/constructability review Managing multiple projects Bid packaging, contract negotiating, scheduling/planning Cost/production control, project close out 20 years experience in the heavy construction industry
Work History: May 2008 through present: Consulting with contractors Take off proposed projects to bid Preparing hard bid packages Writing subcontracts
2005 through April 2008: Bartlett Contracting Company Birmingham, Alabama Project manager/Estimator: Plan and seek projects consistent with company marketing strategy, while managing details associated with individual projects Visit proposed project site to determine site conditions Review plans to compare existing conditions to proposed Take quantities off of design plans-using pay dirt software Determine type and amount of equipment to install project Review project quantities to apply the personnel for project Calculate labor, equipment, materials and subcontractors cost Secure equipment and calculate cost Pre bid meetings Prepare hard bid package Submit hard bid Project management Develop and implement pre construction meeting with design engineer and owner to resolve any issues that may be involved with construction Develop project construction schedule Negotiate and prepare trade contracts of sub contractors Authorize material and equipment purchases Conduct shop drawings and submittal review Prepare and review monthly construction pay request Review all change orders prepare and execute any and all change orders Review and develop cost tracking, production, and cost projections report Review with design engineer close out paper work Expedite with design engineer and owner project punch list completion and final payment
Project supervision Direct and over see Superintendent and construction team Develop and implement safety and compliance program Review safety meeting documents Conduct weekly project progress meeting Conduct and maintain quality assurance of materials quality of workmanship Review and maintain construction compliance and contract documents Facilitate owner and acceptances of project
1998 through 2005: Ocet Inc. Leeds, Alabama
Operations Manager: develop and administer estimating team Develop and administer accounting department Securing civil projects through negotiating and/or hard bid process Taking quantities off of plans (cubic yards of soils, materials) Determine if the project is an balanced, waste or borrow project Cost estimating (labor, equipment, materials, and sub contractors.) Solicit suppliers and subcontract bids Reviewing and authorizing payments of vendors and subcontractors Review and implement monthly progress payments Securing bonding, insurance, permits etc. Preparing bid proposal package Submitting hard bids
1988 through 1997 Ground Engineering, Birmingham, Alabama
Department manager subsurface investigating Plan and seek projects consistent with company marketing strategy Bid or quote jobs based on profitability and overall market strategy Review and critique cost estimates and take off of plans in a timely manner Maintain knowledge of updated production rates, subs labor rate, pricing methods, cost containment and value engineering methods Implement programs to promote cost effectiveness Train new hires Manage change orders, field work orders, and all budgetary items associated Directly supervise field staff Maintain all job journals Create construction schedule and monitor cost and production Manage billing with CFO Schedule, conduct progress meeting with design engineer and client Manage subcontractors, progress and invoicing
Subsurface drilling to obtain splt spoon samples in order to classify soils to determine soil strengths/weakness for structure foundation Determine depth of rock, type of rock characteristics Install monitoring wells
Projects
Fultondale Subdivision, Fultondale, Alabama
Clearing and grubbing 205 acre Design, developed environmental safe burning system Excavation of 1.4 million cubic yards mass rock and soils Design and developed excavation method to utilize rock excavation in slopes and earth dams Installed 7.6 miles gravity sanitary sewer Design and developed storm water out fall Installed network of highway and bridges
Water reservoir Chattanooga, Tn. Core drill and collected soil and rocks samples for construction of 60,000 acre reservoir dam classify soils and rock to determine the presents of fractures/faults for the construction of earth dam
Highway 31 bridge Decatur, Alabama Developed and implemented drilling method on the Tennessee River 60 feet of water, 30 feet of silt, 70 feet rock Collect core samples of bed rock To determine the characteristics of bed rock for the construction of a 4 lane bridge across the Tennessee River Conduct daily meetings with ALDOT design engineers on projects progress and conflicting issues ie barge traffic, weather conditions
Weaver Avenue Leeds, Alabama Jan. 2006 June 2007 7 mile four lane highway 1.2 million cubic yards mass excavation Sanitary sewer, storm sewer, water, asphalt paving, and curb and gutter Developed and implemented construction method to remove and stabilize unsuitable soils, to improve the integrity of the asphalt paving foundation Developed and design rerouting of quad 72 inch storm drain Developed and implemented flood relief storm water out fall after massive flooding.
Oliver Lock and Dam, Northport, Alabama
Install coffer dams across Warrior River 2.4 million cubic yards mass earth excavation Diversion channels 4 each 75x 4500 Lined with class 2 Rip Rap Install 750,000 tons Rip Rap
Pensacola Water, Pensacola, Florida
Installed 6,200 24 Barge pipe across Pensacola Bay
Fort Walton Water- Fort Walton, Florida Installed 7,300 20 Barge pipe across Choctawwohatchee Bay
O.S.H.A. 40 hour training F.E.M.A. Opp training
Education: B.S.C.E. University of Central Florida (1973) Geotechnical University of Alabama Birmingham
Equipment Rock trucks dozers, excavators, scrapers,
Software: Pay dirt, Timberline, MS word, excel
.
|