Vermont Electric Power Company (VELCO)  Jobs (Visit website)
Energy Producers- Developers
Company Description:

The creation of VELCOs first transmission lines was an efficient solution for moving newly available St. Lawrence power into Vermont. In response to rising demand for services and the oil embargo of the early seventies, VELCO's role grew to include acting on behalf of Vermont's utilities as the agent for out-of-state power contracts. Assuming this responsibility saved money and substantially increased reliability through newly interconnected operations. Later, VELCO was specifically tasked to serve as representative for Vermont's combined utilities at what was the precursor to today's ISO-New England. VELCO gave Vermonts utilities a strong unified voice. VELCO's construction of the Highgate converter made interconnected operations with Hydro-Qubec possible and so played a role in securing the HQ power contract.

The initial 224-mile 115 kV VELCO system was placed in service in September 1958. Since that time, VELCO has expanded its facilities and services as required by the needs of its participants and the development of the industry. Currently, it manages a transmission system consisting of 732* miles of transmission lines 115 kV to 450 kV D.C., 53 substations, a 200 MW back-to-back HVDC Converter** and over 13,000 acres of rights-of-way. To monitor and control this system VELCO uses an extensive fiber optic communication network.




Construction Job Openings




Company News

Home | About | View Jobs | Post Jobs | Top 100 | Profiles | Answers | Report | Directories | Contact