SENIOR CONSTRUCTION MANAGEMENT Airport Strategic Planning Multi Site Management Visionary Leadership
Accomplished Construction Professional with over 20 years experience in Planning, Leading, Managing and Expediting the Overall Operations of Construction for: International Airports, Departments of Transportation Heavy Highway Projects, Bridges, Industrial, Commercial and Land Developments. Extensive Managerial Experience in Airport Terminal Construction, Logistics, Concrete Plant Installations, Contractors, MEP coordination, Equipment, Trucking and Crane utilization, precast, structural concrete and post tensioning. Passenger jet way and baggage systems, elevators, escalators, moving platforms, interior and exterior finishes. Slip form Concrete and Asphalt paving, milling and crushing operations, auger cast pilings, sheeting, deep concrete foundations, directional boring, shoring, dewatering, mass excavations, demolition and site logistics, FAA signage, lighting, pavement marking, all Civil Disciplines, Underground Utilities and Environmental Protocol. Will provide effective interface for: DOTS, DERM, OSHA, Developers, Municipalities, Owners, Clients, Architects, Consulting Firms, Engineers, Contractors, Trades and Staff Personnel, to ensure the safe, timely completion of projects within or under budget. Projects range from $3 Million to $1.6 Billion.
CORE COMPETENCIES
Extensive Airport and Heavy Highway Knowledge Planning & Organizing Projects Fast Tract Scheduling Excellent Accounting Skills Excellent Communicator Contract Negotiations Safety & QAQC Standards Business Development Sales & Marketing
Key Achievements: -Constructed the deepest underground vehicle structure on the Florida coastline in Miamis South Beach W Hotel. -Successfully placed $5 Million / Month at Detroit International Airports New NWA De-Icing Facility. -Successful in reviewing pre-construction, conformed document plans and finding numerous errors overlooked by architects and engineers, therefore solving the problems before construction activities commenced which eliminated potential project delays and costs at Miami International Airports $1.6 Billion Renovation. -Successful in completing multiple projects ahead of schedule, under budget & without injury. -Successful in the re-engineering of the foundation schedule at Pittsburgh International Airport which resulted in the completion of the mass foundation system for the Landside & Central Service Buildings, 6 months ahead of schedule saving $600K.
PROFESSIONAL EXPERIENCE
2007 - 2009 Sr. Superintendent / K.M. Plaza Construction Services, Miami, Florida W Hotel Miami South Beach, Oceanfront Hotel & Residences Lead operations and strategic direction for all Structural, Civil, Site Logistics, and Dewatering at -24 feet below sea level for Underground Valet Tunnel. $300 Million Marquis Hotel & Residences Lead operations for construction of 14, 3 level Townhomes, Pools, Spas and water features of 67 story building. $380 Million
2001-2006 Site Manager / Superintendent / Turner Austin Airport Team, Miami, Florida Miami International Airport Terminals B, C and E Refit., D Extension New Construction, Concrete / Asphalt Taxiway Connectors, Interior Roads and Tug ways, Demolition of existing buildings structures and utilities, installation of new underground facilities, including new jet fuel system, International and Domestic Baggage system, site logistics, FAA signage and lighting. $1.6 Billion Toscano Dadelands Premiere Residences Civil Site Superintendent/ Mixed use Condominiums, 26 story high-rise, 397 units and retail space, New Roadways, FDOT Tie ins, Embankments for Snapper Creek Drainage Rehabilitation, Grading ,Paving and all Civil Disciplines. One million square feet. $115 Million
1998 2001 Project Manager / General Superintendent / The Carlo Corporations, Clinton Township, Michigan Greater Orlando International Airport New Fed Ex air cargo building facility, Site logistics, security, demolition, excavation, grading, utilities, concrete paving. Rehabilitation of existing UPS Air Cargo Facility. Airside I & III concrete pavement & joint rehabilitation. $30 Million Tampa International Airport Concrete taxiway N & new air cargo facility, site security and logistics, demolition, crushing operations, dewatering, all related underground utilities, electrical lighting, signage, concrete & asphalt paving. $7 Million Detroit Metropolitan Airport Northwest Airlines concrete de-icing facility & related taxi lanes, Interior Roadways, glycol underground recovery system, new glycol storage facility, disbursement operations building, lighting, signage, concrete and asphalt paving & all related underground utilities. $20 Million
1993 1998 Project Manager / General Superintendent / Independent Enterprises Inc., Pittsburgh, Pennsylvania Commercial Site Developments Educational facilities, Wal-Marts, Sams clubs, Home Depots, Kohls Dept. Stores, Pets R Us, Strip Malls, PENNDOT County and City Roadway Systems, mass excavations, balancing, underground utilities, grading, paving, tilt wall/structural concrete, with associated, lighting, signage, landscaping, concrete & asphalt paving. $82 Million
1992 1993 General Superintendent / Macomb Contracting Company, Fraser, Michigan Grand Rapids International Airport / Rehabilitation Taxiway & Ramp Aprons. $6 Million MDOT Projects Detroit, Michigan / Coolidge Road Widening and Oak Park Blvd. Rehabilitation and Expansion. $ 10 Million
1989 1992 Sr. Project Manager / General Superintendent / C.J. Rogers Inc. / Pittsburgh, Pennsylvania Pittsburgh International Airport Landside, Central Service Buildings, underground utilities, blasting, mass excavation, auger cast piling floor support system, underground people mover, baggage & service tunnels, structural concrete, site logistics with all associated civil work. $300 Million Interstate 40 Union Town PA DOT By-Pass Clearing & grubbing, mass excavations, blasting, balancing, grading, underground utilities, retaining walls, railroad crossings and concrete paving. $20 Million Chrysler Proving Grounds, Chelsea, Michigan Test track facility, excavation, grade separations, drainage & asphalt paving for new acceleration/deceleration ramps. $3 Million . 1985 1989 Project Manager / Superintendent / Holloway Construction Inc., Wixom, Michigan Interstate 696 Expressway MDOT/ 6 miles of mass excavation, utilities, Slip form concrete pavement, retaining walls, asphalt service drives and all related cross over bridges. $72 Million Coolidge Road & Oak Park Blvd, MDOT/ Rehabilitation and expansion, 4 miles. $10 Million
1979 1985 Sales Manager / Sales Representative / Detroit, Michigan The Levy Corporations / Sales of Concrete and Aggregates International Harvester Corporation / Heavy Truck Sales and Marketing Martin Engineering Inc. / Material Handling Systems
1976 1979 Excavation Superintendent / Field Engineer / Macomb Contracting Corporation, Fraser, Michigan Nashville Metropolitan Airport Concrete runway strengthening overlay, Asphalt taxiways. $8 Million LA DOT Louisiana / Shreveport By-Pass Expressway Clearing, mass excavation, balancing, final grades, underground utilities, Slip form concrete paving. $11 Million
References, Letters of Recommendation, Industry Certifications and Education available upon request.
|