Name : MC
Industry Type : Design Build Firms- EPC
City & State : St. Petersburg, FL
Job Title Senior Project & Construction Manager / Program Manager
Relocation Preferences : open
Objective : Michael C. Tyler
525 Lillian Drive, St. Petersburg, Florida 33708
Cell: (727) 743-6883 / Email: MichaelCTyler[at]HotMail.Com

To whom it may concern,

I am interested in Construction and Engineering employment opportunities within your firm...
As you will note on my resume, I have over twenty-five (25) years of experience managing a full range of multimillion-dollar construction and design projects. I began my career as a journeyman and worked my way up the ranks from there. I have worked at every level and have an in depth understanding of construction; not just how to best design a solution but how to actually implement it in the field.
Most importantly, I am a motivated team player, with an if there is a will - there is a way attitude that has lead to the successful completion of many complex projects and happy clients; I encourage you to contact my references.
Id greatly appreciate the opportunity to discuss with you further how I can contribute to your firms continued success and look forward to hearing from you soon.
Sincerely,

Michael C. Tyler
Cell: (727) 743-6883
Email: MichaelCTyler[at]HotMail.Com






Resume :  
Michael C. Tyler
525 Lillian Drive, St. Petersburg, Florida 33708
Cell: (727) 743-6883 / MichaelCTyler[at]hotmail.com

Construction & Engineering Management

Offering a comprehensive background based on over 25 years experience demonstrating expertise as Management and Supervision in the design and execution of national & international construction projects and facilities. Twenty (20) plus years managing and supervising design, engineering, architectural and construction of turn-key, design/built, fast track projects. Instrumental in the successful completion of several multimillion-dollar projects on schedule and within budget in the United States. Scope of expertise:

Project Managed and Supervised state and federal, military, industrial, marine, commercial projects. Coordinated and consulted with state & city agencies within the construction /engineering /architectural/civil. Federal & State Clearance
Evaluate and review project plans, design, specifications, estimate costs, solicit bids, negotiate contracts with general contractors, subcontractors, clients. Managed budget, track costs; resolve emergent issues; justify and negotiate change orders. Document control, coordination shop drawings, building department comments, and fire & life safety codes ratings.
Managed and Supervise coordinated schedule, construction, MEP, mechanical, electrical, plumbing & engineering teams.
Develop Safety Programs &Variances commensurate to corporate, government, and regulatory agency laws & standards.
Purchase and control inventory of project materials negotiated and purchased materials and equipment.

PROJECT CONSTRUCTION MANAGEMENT HIGHLIGHTS
(Review Sample Project List)
International Design Center - Estero, Florida - Miromar Development Corporation - Director of Construction & Engineering Owners Representative for this project Complete Design/Build, 3-story tilt-up construction, over 400,000 square feet building on 38-acre campus. Managed the complete design and field operations. Project completed on schedule and within budget.
Raymond James Stadium Tampa Florida - Metric Constructors - Sr. Project Manager / MEP Manager
The 134 acres known as the Stadium Complex (formerly Tampa Stadium) and parking lots. Over 65,000 seats designated as general seating. Over seen field staff and resolved MEP issues.
Tampa International Airport -Tampa, Fl. -Turnaround Project- Metric Constructors - Sr. Project Manager
Design/Built, Service Building (30,000 sq. ft., 2 stories) offices, security control and centralized monitoring systems.
LaSalle County Nuclear Station Unit 1 & 2, Seneca, Illinois - Commonwealth Edison Company / Walsh Group, Chicago, Ill. Supervision and Management and related roles - GE Dual-Reactors. Construction project cost was over $6.5 billion dollars.
M.E.M.C. South West, Sherman, TX. - Fluor Daniel - Sr. Project and Engineering Manager
Silicon Wafer 200 M.M. Facility. Complete Design/Build, 4-story Construction. Orchestrated construction and engineering for process tool hook-up and clean rooms. This was a Mega Project in the Southwestern part of the United States.
Vivante - Punta Gorda, Florida - Stock Development Vice President of Construction Engineering Due to a design change by Stock Development of the private elevators were built not in compliances with four buildings, per Chapter 61C of the Florida Administrative Code, Florida Building Code, 2001 edition, NFPA 101, Life Safety Code, 2000 edition and ASME A17.1, Safety Code for Elevators & Escalators. I wrote and received a variance from the State of Florida Tallahassee, Florida. If the variance was denied the cost to Stock Development would exceed $30 million.
Pontiac Pump Station - Pontiac, Illinois - H.J.Eppel & Company - Sr. Project Manager
This was project was for the City of Pontiac. Complete Design/Build, wastewater and treatment plant. The wastewater treatment plant to utilize biological processes to recycle and treat water so it can be safely returned to the river. The project came in within budget and on schedule. . Received award for Management from the City of Pontiacs Mayor.
Charlotte County Jail, Punta Gorda, FL. - Metric Constructors - Sr. Project Manager / MEP Manager
Design/Built construction of a state-of-the-art courtroom and cells. Project completed on schedule and under budget.
Awarded, Excellence, Associated Builders and Constructors, Inc. for outstanding performance.
Doctors Hospital Of Sarasota Sarasota, FL. - Sr. Project Manager - (remodeling and updated equipment), 168-Bed acute and general care facility. Coordinated with (AHCA), Agency Healthcare Administration / State of Florida, to meet all required heath care code regulations. Awarded outstanding approves for meeting heath care regulations. Facility was in full operation.
Little Haiti Cultural Campus - Miami, Florida - HDR Engineering / Senior Project and Construction Manager Design and construction of " Black Box" theater and Caribbean Marketplace restoration . The Community Center complementing the other cultural components of the park. Received award for Management from the City of Miamis Mayor, Mr. Manuel A. Diaz and also received appreciation award from the City Commissioner.

PROFESSIONAL RECOGNITION / MEMBERSHIPS
Awarded Excellence in Construction 2001 by Associated Builders and Constructors, Inc. for outstanding performance.
Received two U.S. Patents. Former member Local 63 Carpenters and Local 1051 Millwrights in the State of Illinois.
General Contractor license / AWS Certified Welding Society
Expert authority on Mechanical Systems, Electrical Systems, Control Systems, Fire, and Life Safety Ratings.
Received recognition for Outstanding Construction and Performance for projects and leadership.
Tampa, Miami, Naples and St. Petersburg, Florida Chamber of Commerce
Member. American Society of Mechanical Engineering (ASME)
Received awards for Management from City of Miami Mayor, Mr. Diaz, appreciation awards from Cities Commissioners.

Page Two

PBS&J - Post, Buckley, Schuh & Jernigan, Inc. Miami, Florida 2008- 2010
Senior Project and Construction Manager - Consultant

PBS&J was awarded the City of Miamis Capital Improvements Program Management consultant contact. HDR Engineering elected not to renew their contact for the Program Management contact. Mr. Pedro G. Hernandez, City of Miamis City Manager requested that I stay with city and work though PBS&J as the City needed my technical experience, management, leadership and motivation skills help manage the City of Miami Capital Improvement program and projects. Consulted for the City of Miamis $750 Million Capital Improvement Program (CIP) and various other city departments. Oversaw the quality of design, construction, procurement, and permitting efforts; managed contracts; conducted regulatory and technical reviews; wrote scope of work and specifications; estimated costs; negotiated contracts; evaluated change orders; attend public meetings and work with residents; provided a comprehensive approach for the maintenance of projects; personally maintained $200 million worth of projects within budget and on schedule. During this time I worked directly and indirectly with City of Miamis, City Manager, Mayor and the Commissioners though out the City of Miami. Received awards for Management from the City of Miamis Mayor, Mr. Manuel A. Diaz and also received appreciation awards from the Cities Commissioners.

HDR ENGINEERING, INC. Miami Lakes, Florida 2006- 2008
Senior Project and Construction Manager - Consultant

HDR Engineering, which has a consultant contract with the City of Miami to Program Manage the Capital Improvement and Transportation Department. Recruited to consult and work with various City of Miami departments, Fire and Police department, Parks, Economic Development, Community Development, and Public Works. Program Manager for the Job Order Contracting (JOC), responsible for administrating, coordinating, and managing various departments of Design, Construction, Procurement, Permits Manage and coordinate construction contracts, evaluation and review of plans, wrote scope of work and specifications, estimated costs, negotiated contracts, construction project schedules and funds allocation issues. Provide Financial Project Analysis for Capital Improvement projects as well as process work orders evaluation of change orders and provide recommendation of such work order to upper management for approval of City Commission. Attend public community meetings and work with residents concerns and complaints. Provide a comprehensive approach as it relates to the Citys Capital Improvement Program for maintenance of projects and develop internal process and procedures to deliver a systematic approach for future construction program management needs of the City of Miami. Oversee the quality and implementation of production process and procedure from initial scope to 100% construction documents. Work closely with other private and public entities for coordination of ongoing construction projects. Coordinated with, and managed, City staff and consultants to deliver the Capital Improvement Program in accordance to established guidelines. Responsible for maintaining projects within budget and on schedule. HDR Engineering ranked in top 10 Engineering consulting firms.

STOCK DEVELOPMENT, Naples, Florida 2005-2007
Vice President of Construction & Engineering

Joined Stock Development to manage and coordinate the construction, engineering and architectural designs of all projects. Manage project mangers, office staff, land development and AutoCAD personnel. Including document control, reviewing and coordination of shop drawings. Review, write and negotiate contracts. Obtain building permits with Collier County, Lee County and. Charlotte County. Review and respond to building department comments and issues, which include fire codes ratings. Meetings with local government agencies and environmental organizations to resolve any and all issues, including impact and permit fees. Managed the daily operations of a development firm including resolving legal issues. Also, involved in sales and marketing. Participated in presentations in be awarded Murdock Village in Charlotte County, Florida. Wrote an Emergency Variance for Stock Development to the State of Florida, Tallahassee, Florida. If the variance were denied, the cost to Stock Development would exceed well over $30 million and over 4-5 months for redesign, re-permitting and construction. Received recognition & compensation for this issue.

MIROMAR DEVELOPMENT CORPORATION, Estero, FL. 2004-2005
Director of Construction & Engineering

Recruited as owners representative to manage the construction Complete Design/Build, multi-million dollar, 3-story tilt-up construction, over 400,000 square feet building on 38-acre campus. Managed and oversaw the complete design, construction and field operations. Project completed on schedule and within budget. Managed the construction of Miromar Outlets Phase 6 outlets and high end, resort-style dinner club within the Miromar Lakes Beach & golf club community. Miromar Development Corporation is an international commercial and residential real estate developer, property management & leasing, with properties in the United States and Canada. News-Press voted Miromar Outlets as the best shopping center in southwest Florida.




Page Three


MATHEWS CONSTRUCTION, Tampa, FL 2004
Consultant / Senior Construction & Engineering Manager

Recruited as a consultant, key technical advisor and sales representative to secure closure for the contract on a complete Design/Build, project at Tampa International Airport, Service Building Expansion for the Hillsborough County Aviation Authority. Addition and 3-story interior renovation, which include complete Communication & Security Center Study to move from the first floor to second floor. Also, oversaw a condominium project, Grande Preserve. Evaluation and review of plans, wrote specifications, estimated costs, solicited bids, negotiated contracts, scheduled and also fill-in the role as MEP Manager and Superintendent to coordinated design, engineering and supervised construction teams. Purchased scheduled and controlled inventory of material. Participated as a consultant in marketing presentations to future clients.

METRIC CONSTRUCTORS, - (aka J.A. Jones) Tampa, FL 1998-2003
Senior Project Manager

Recruited to manage multi-million dollar construction projects involving Turnarounds on the Sirata Beach Resort & Conference Center, 8-story, and the Tampa International Airport, The Cloisters, High Rise 16-story luxury condominiums projects. The Key technical advisor and sales representative to secure closure on contracts for the Army Aviation Support Facility in Brooksville, Florida, (Blackhawk Helicopter Maintenance Hangar) and Lucent Technologies project in Orlando, Florida. Also acted in role as MEP Manager and Superintendent, due to the lack of on site experience. Evaluation and review of plans, wrote specifications, estimated costs, solicited bids, negotiated contracts & materials, scheduled and supervised, coordinated construction teams and subcontractors. Purchased, scheduled and controlled inventory. Developed punch list and performed walk through during construction phase and at the completion with clients.

FLUOR DANIEL, - (Fluor Corporation) Greenville, South Carolina 1995-1998
Senior Project Manager / Process & Specialty Project Manager - I.B.M., Essex Junction, Vermont

Managed fast-track, complete facility shutdown (first time in 16 years) for major mechanical upgrade of a silicon wafer facility. Liaison between I.B.M. managers, engineers, supervisors and contractors. Design and construction, 5-story, evaluation and review of plans, wrote specifications, estimated costs, solicited bids, negotiated contracts, scheduled and coordinated construction teams. Purchased, scheduled and controlled inventory of material and tool hook-up for ultrapure gasses, chemicals, water treatment, exhaust, chemical and gas dispensing rooms, ultrapure gas pads, and peripheral systems. Around the clock project completed on schedule and under budget. Received recognition from I.B.M. & Flour, for Outstanding Construction Performance and leadership.

Senior Project Manager & Engineering Manager - M.E.M.C. SOUTHWEST, Sherman, TX. Silicon Wafer 200 M.M. Facility.
Project Managed, Engineering and complete Design/Build, 4-story Construction. Orchestrated construction and engineering for process tool hook-up. Facility included, crystal pulling, polishing, slicing, cleaning and cleanrooms Class 1 to 100,000. Scheduled and managed tool hook-up and ensured quality of installed process systems for ultrapure gasses, chemicals, water generation and distribution, life safety, and exhaust Process & General systems. Reviewed initial design and subsequent submittals of subcontractors, vendor shop drawings and client alterations to coordinate with all other disciplines for facility. Scheduled and coordinated process tool set, hook-up and systems start-up. This was a Mega protect in the Southwestern part of the United States.

TKS - (aka TAIKISHA), Tokyo, Japan 1987-1995
Project and Construction Manager - Various projects

TKS Industrial Headquarters: Dublin, Ohio; in 1989 transferred to (Silicon Valley) Santa Clara, California to open up Taikishas Advance Technology West Coast Office. Home office, Tokyo, Japan.Taikisha is a national and international construction management-engineering firm. Design/build state of the art (advanced technology), industrial, and commercial facilities. Evaluation and review design, wrote specifications, estimated costs, solicited bids, negotiated contracts, scheduled and coordinated construction teams. Purchased, scheduled and controlled inventory of material. Never missed a deadline or went over budget.











Page Four


Terry Development Corp, Design/Build / Stone & Webster / Bechtel / Westinghouse / NKC Conveyor - Various projects 1974 -1987
Local 63 Carpenters / Local 1051 Millwrights / Superintendent / Project Manager / MEP Coordinator / Engineer

Interstate Highway 55 Dwight, Illinois Superintendent New Interstate highway, includes complex highway interchanges, bridges, roads, asphalt paving, and underground utilizes, drainage systems.
Fox Run Housing Subdivision - Virginia Beach, VA. - Terry Development Corporation / Design/Build - General Superintendent Over 250-unit subdivision, Completely Built, hands-on, bright work and fine finish hardwood trim/cabinetry, and furnishings. Scheduled and coordinated construction teams. Developed punch list and performed walk through during construction and at completion. Oversaw all items of punch list was completed with quality and satisfaction of customer.
Diamond Springs Apartments Virginia Beach, VA. - Terry Development Corporation / Design/Build - General Superintendent - Complete developed, design and build 1 and 2 bedrooms, 750 to 1000 square footage townhouse, and 1 to 1.5 bathrooms. Clubhouse, pool, tennis and fitness facilities. Scheduled and coordinated construction teams. Developed punch list and performed walk through during construction and at completion.
Pembroke Square Apartments - Virginia Beach, VA. - Terry Development Corporation / Design/Build - General Superintendent Complete developed, design and build 1, 2 and 3 bedrooms, 825 to 1225 square footage townhouse, and 1 to 1.5 bathrooms. Private patio and balcony, Clubhouse, swimming pool, tennis facilities and fitness center. Scheduled, coordinated construction teams.
The Mansards - Virginia Beach, VA. - Terry Corporation / Developers - General Superintendent - Complete developed, design and build 1, 2 and 3 bedroom, 913 to 1212 square footage Private patio / balconies, eat-in kitchen, formal dining room, play area and wading pool, Clubhouse, swimming pool, tennis facilities and fitness center. Scheduled and coordinated construction teams.

Responsibilities included:

Extensive experience and responsibilities as Owners Representative, Consultant, Vice President of Construction Engineering, Director of Construction, Construction Manager, Senior Project Management, MEP Coordinator and Supervisory roles.
Implementing and maintaining policy and procedure relating on time scheduling, quality control, construction administration and safety. Maintain appropriate records to comply with OSHA regulations and updated as-build drawing documents.
Coordinated and obtain building permits issues.
Hired, assigned and trained construction and office staff.
Excellent people skills, communication and motivation skills with confidant negotiating skills.
Developed punch list and performed walk through during construction phase and at completion.
Instructing new personnel to operate and maintain equipment.
Extensive technical and hands-on experience, combine with troubleshooting skills.
Oversee construction schedules, general contractors, subcontractors and inspections.
Disaster Clean Up of large communities, countries and state for federal and state government.

Computer Knowledge: AutoCAD 2000, MS Office 2000, Primavera Scheduling, Prolog Manager. Site Manager, TRACS.

EDUCATION

Illinois University Champaign-Urbana, Illinois Mechanical Engineering
Joliet Junior College Joliet, Illinois - Welding & Welding Engineering
AWS Certified Welding Engineer - WWA, MIG/MAG, TIG
Fluor Daniel Greenville, South Carolina Project Execution Leadership
Union Local 63 Carpenters / Bloomington, Illinois
Union Local 1051 Millwrights / Lincoln, Illinois
General Contractor license
Radiation Safety Certification


Specialized Training:
Mechanical EngineeringBusiness Development
Project ManagementWelding Engineering
Leadership Development Mechanical Systems
Control Systems Journeyman Carpenter
Journeyman Millwright Journeyman Welder
Robotic Engineering Conveyor Systems
Hazmat American Red Cross / CPR & Lifeguard


Page Five
SAMPLE PROJECT LIST


PUMP STATIONS & WASTE / WATER TREATMENT

Henrico County Water & Waste Treatment Facility Hopewell, VA. Construction Manager - Completely New Design/Built, Mechanical & electrical and controls. Installation of water treatment process equipment, set and hook-up and including start up of facility and all federal and state testing. Instructing new personnel to operate and maintain equipment. Completely build and design all facility office area, including bright work and hardwood trim/cabinetry and furnishings. Developed punch list and performed walk through during construction and at completion with client.
Pontiac Pump Station - Pontiac, Illinois - H.J.Eppel & Company - Sr. Project Manager
This was project was for the City of Pontiac. Complete design and build a new wastewater and treatment plant. The purpose of the wastewater treatment plant is to utilize biological processes to recycle and treat water so it can be safely returned to the river. The water that we recycle consists of residential, industrial and storm runoff. Designed for 3.5 MGD, million gallons per day, which can process up to 10 MGD during peak storm events. Included elaborate monitoring system to monitor the wastewater processes. The facility has strict permitting from the Illinois EPA, Environmental Protection Agency. The facility included an environmental laboratory where operators perform many different analytical tests. Or NPDES, National Pollution Discharge Elimination System permit regulates parameters. The EPA has established for the Vermillion River watershed. In addition to City of Pontiac laboratory they also perform laboratory analysis for 12 other treatment permitted systems. Managed the complete project, including the design and construction. The project came in within budget and on schedule. . Received award for Management from the City of Pontiacs Mayor.
LeClaire Pump Station - Bedford Park, Illinois Sr. Project Manager
The facility was design / built for the Village of Bedford Park. Has four 600 HP pump motors, capability to pump over 41,600 gallons of water per minute The facility has additional two pumps, which increases the discharge volume to up to 62,400 gallons per minute The piping is 54 inside and restrained joint ductile iron pipe outside the building. The building is equipped with 2250 kW generator, overhead crane, a SCADA control room, chlorine room, and truck bay. Review project plans and specifications, estimate costs, solicit bids, and negotiate contracts with subcontractors and client. Managed budget and track costs; resolve all emergent issues; justify and negotiate change orders. Document control, coordination shop drawings, building department comments, and fire & life safety codes.
Chattahoochee Raw Water Pump Station Atlanta, Georgia Skanska Consultant / Sr. Manager Project was for DeKalb County Public Works Department. The Chattahoochee raw water pump station in Atlanta. Chattahoochee Pump Station and Pipeline Replaced old pump station with new upgraded facility downstream from the original site. The project is a water treatment, sewage treatment, raw water pump station, Raw Water Intake, Included a new administration facility and Sitework. Over saw the design and construction, including permitting process.


DAMS AND LOCKS

Marseilles Lock & Dam - Marseilles, Illinois J.A. Jones - Project & Construction Manager
US Army Corps of Engineers project. Design and construction to update and repair the concrete structural walls, dam piers repairs and replacement. Replace and repairs the submersible tainter gates. These gates can be raised to allow water to flow under them in the summer, and then lowered to allow ice to flow over them in winter. Installed new mechanical, electrical equipment and controls. Managed the tight 24 hour, 7 days week schedule and supervised the coordination of the construction and engineering teams. Project on time and within schedule.
Mississippi River Lock & Dam - Quincy, Illinois Union Local Millwrights General Superintendent
Worked with the US Army Corps of Engineers. Repair and replacement of the submersible tainter gates and roller gates. Installed new mechanical, electrical equipment and updated control systems. Included dam, dam piers, river wall concrete repairs and crane rail adjustments. Supervised the construction teams.
Dresden Lock & Dam - Will County, Illinois - J.A. Jones - Construction Manager
US Army Corps of Engineers project. Design and construction to update and repair the canal structural walls, roller & tainter gates, concrete, dam piers. Which also included the completely resurfacing the horizontal interior lock walls. Install new crane and rails. The replaced old pumps with new upgraded pumps. Also, included repairs and updating the Stratton State Park. Managed the fast track 24 hour, 7 days week schedule and supervised the coordination of the construction teams. The project was completed on schedule and within budget.







Page Six
SAMPLE PROJECT LIST
COMMERCIAL

International Design Center -Estero, FL. - Miromar Development Corp. - Director of Construction & Engineering Complete Design/Build, 3-story tilt-up construction, over 400,000 square feet building on 38-acre campus, including a beautiful sky-lit atrium lobby, with its gourmet caf and coffee bar. A Centerpiece on lushly landscaped on will offer designers and customers a bright and airy place to relax and refresh. Will also include a business-class hotel, office building and lakes.
Lynnhaven Mall Virginia Beach, Virginia Terry Corporation / Developers Construction Manager Complete Design / Build, One of the largest shopping malls on the east coast. Including four department stores, Dillards, Hechts, J C Penney, Lord & Taylor, AMC Lynnhaven 18 theatres, Food Court, one-of-kind childrens play area and more than 176 specialty stores. Scheduled construction teams, purchased and controlled inventory of project materials.
Aragona Shopping Center - Virginia Beach, Virginia - Terry Corporation / Developers Construction Manager - Complete Design/Build, 86-stores, single story shopping center. Scheduled and coordinated construction teams.
Hong Kong Restaurant Clearwater, Florida Myself - Completely Design/Built, Complete restaurant and kitchen build out and including set and hook up kitchen equipment. Coordinated with all other disciplines to solicit bids and negotiate contracts. Scheduled construction teams, purchased and controlled inventory of project materials.
Pembroke Mall, Virginia Beach, Virginia Terry Corporation / Developers Construction Manager Renovation, one-level mall, including Sears, Kohls, and Stein Mart, Regal 8 Cinemas and over 100 specialty shops and restaurants.

CORRECTIONS

Charlotte County Jail, Punta Gorda, FL. - Metric Constructors - Sr. Project Manager / MEP Manager
Design/Built construction of a state-of-the-art courtroom, support operations with a cell capacity for 784 inmates. Highlights included chilled water system and computer control networks for HVAC, smoke evacuation, and central security requirements. Managed all mechanical, electrical, plumbing and control systems which also included design issues. Awarded Excellence in Construction 2001 by Associated Builders and Constructors, Inc. for outstanding performance.
Federal Correctional Facility, - Petersburg, VA. Bell Corporation - Construction Manager
Design/Built, additional 225 maximum and medium security cells included chilled water system and computer control networks for HVAC and central security requirements. Project completed on schedule and under budget.

POWER PLANTS

Clinton Nuclear Power Plant Unit 1, Clinton, Illinois Illinois Power Co. / Baldwin & Associates, Cincinnati, Ohio. Supervision and Management and related roles in turbines area and process piping systems - Reactors design by General Electric with total 933,400 Megawatts reactor and is a (BWR)-boiling water reactor, constructed on over 5,000-acre cooling reservoir are located on the worlds largest power plant site, over 14,000-acre site. This was over $4-billion dollar project.
Collins Generating Station, Morris, Illinois Midwest Generation / Edison International Company General Superintendent Five units, totals 2,698 net megawatts (Units 1 & 2, 554 MW each and units 3-5, 530MW each). Boilers offer dual fuel capability and are designed to burn either natural gas or oil and equipment to reduce nitrogen oxides (NOx) installed on five units to converted from oil-fired to dual fuel (gas and oil) to meet current state and federal EPA limits. Has five condensate storage tanks with a combined capacity of 2.4 million gallons and two well storage tanks with a combined capacity of one million gallons and also has a man-made cooling pond. Over $3-billion dollar project.
LaSalle County Nuclear Station Unit 1 & 2, Seneca, Illinois - Commonwealth Edison Company / Walsh Group, Chicago, Ill. Supervision and Management and related roles Reactors supplied and design by General Electric is a dual-reactor with a 2,156,000 net megawatts total, (BWR)-boiling water reactor The units are cooled with water from a 2,058-acre man-made lake. Construction project cost was over $6.5 billion dollars.
Dresden Nuclear Power Station Unit 2 & 3, Morris, Illinois - Commonwealth Edison Co. Supervision and Management and related roles, Turbines & Generators and process piping systems. Reactors, design by General Electric with a total of 1,588,000 Megawatts reactor, both units are (BWR)-boiling water, Located on over 953-acre site. Over $6 billion dollars
D C Cook Nuclear Power Unit 1 & 2, Bridgman, Michigan Indiana Michigan Power Company Supervision, Management and related roles Reactors supplied and design by Westinghouse, 2060 Megawatts total reactor, two (PWR)- pressurized water reactor units, constructed on over 650-acre site, Lake Michigan is cooling water source. Over $6 billion dollar project.







Page Six
SAMPLE PROJECT LIST
HISTORICAL RESTORATION

Portsmouth Naval Hospital United States Navy Portsmouth, Virginia - Senior Project Manager
Naval Medical Center Portsmouth's Building was Completely restoration restore, marking the complete Naval Medical Center Portsmouth is the oldest continuously running hospital in the Navy Built in the mid-1700s as a colonial defense, Fort Nelson lay unused until 1827, when the commissioners of the Naval Hospital Fund were granted their request to build the first naval hospital. The hospital admitted its first patients in 1830 and has treated patients continuously since then. This was a large restoration restore project.
Black Police Precinct & Courthouse Museum Miami, Florida HDR Engineering / Senior Project & Construction Manager
This was Interior and Exterior was completely restoration the existing abandoned black police precinct headquarters to its original condition for use as both a museum and a community center. Work includes complete design of all structural and repairs, new mechanical system, electrical, life safety systems, adding an elevator and police equipment. This was a Turnaround Project Requested by the Miamis Mayor and City Manager to take over and complete the project.
Old Miami High Miami, Florida HDR Engineering / Senior Project and Construction Manager The building was Disaster Clean Up. The building was moved and complete interior and exterior restoration. The building is now located within the Southside Park Miami. It was built in 1905 in Downtown Miami as the citys first high school; this wood frame structure was moved south of the Miami River in 1911. It served as the first Southside Elementary School from 1911 to 1914, later becoming a boarding house. Old Miami High has now been restored, with an historic classroom for tours, educational meeting space and a City Parks office. The disaster clean up interior, exterior restoration wood-slate roof, concrete foundation and wood frame building, with its high ceilings, big windows and inviting front porch was originally built in Downtown Miami behind the Miami Grammar School. Its first graduating class in 1906 had four students. The structure served as Miami High from 1905 to 1911, then was moved south of the Miami River to serve as the first Southside Elementary School from 1911 to 1914. The electrical and floors are all new but, floor joists are original with Dade County pine.

PARKS

Little Haiti Cultural Campus - Miami, Florida - HDR Engineering / Senior Project and Construction Manager Design and construction of " Black Box" theater and Caribbean Marketplace restoration . The Community Center complementing the other cultural components of the park. Theater is approx. 18,000 sf with approx.300 seating capacity. Received award for Management from the City of Miamis Mayor, Mr. Manuel A. Diaz and also received appreciation award from the City Commissioner.
Jose Marti Gymnasium - Miami, Florida - HDR Engineering / Senior Project and Construction Manager The gymnasium 16,000 s.f. work includes a new fitness center, an aerobics facility, locker rooms, administrative offices, storage space and a seating area for 500 people which will provide an additional community meeting place for residents. Due to the small size of the site, the building spans over the street.
Little Haiti Soccer Park & Recreation Center - Miami, Florida- HDR Engineering / Senior Project & Construction Manager The work encompasses one FIFA regulation soccer field, one practice soccer field, 10 station fitness trail, sports lighting, tow fixed bleachers with restrooms, concession and field storage areas below the bleachers, toddler playground and splash park, with open picnic shelters, open domino park shelters and a field maintenance building. The Recreation Center is 6,000 sq. ft. of space which includes an aerobics room, arts & crafts room, a multipurpose room, the area NET office and an exercise room. A 4,000 sq. ft. area includes the park offices, multi-purpose spaces, storage areas and mechanical rooms. The entire project is ADA compliant and parking area with over 200 parking spaces. Site construction of 12,000 sf site.
Virrick Park Library - Coconut Grove, Florida - HDR Engineering / Senior Project and Construction Manager The project consists of the design and construction of a new 4,000 sq. ft. addition to the existing Virrick gymnasium. The scope also includes the modification of the existing computer room to accommodate an entrance corridor from the existing community center building to the new addition. The full service library is the product of an Interlocal Agreement between the City, Miami-Dade County and the Miami-Dade Public Library System. It will house a collection of 15,000 materials, with access to the Internet through computer terminals and portable laptops, and residents can look forward to additional educational, informational and cultural services, including free SMART homework tutoring for students K -12 on Saturdays and computer classes for seniors.

INTERNATIONAL GOVERNMENT

Japanese High Rise Embassy Mexico City, Mexico - Taikisha - Construction Manager - (Classified Project), Complete downtown in the city, Renovation of 18-story high rise tower, complete HVAC System, controls and security controls and centralized monitoring systems. Instructing personnel to operate and maintain equipment.
Page Six
SAMPLE PROJECT LIST
MANUFACTURING

Ahresty Diecast, Auto Production Parts Plant - Wilmington, OH - Project Manager - Completely Design/Built, HVAC, Process Piping, Plumbing and Waste Treatment
Nabisco / Pulp & Paper Packaging Manufacturer Marseilles, IL Superintendent - Set and calibrated presses.
Union Camp (Paper Mill) - Chesapeake, VA. - HVAC, Process Piping, Plumbing, Waste Treatment, Calibrate presses.
Sony TV Screen Production Line Mt. Pleasant. Pa. Taikisha - Construction Manager - Design/Built, Conveyor, Robotic, Mechanical systems, electrical & controls. Instructing personnel to operate and maintain equipment.


FOOD PROCESS

Gekkeikan Sake Plant Folsom, CA. Taikisha - Construction Manager - (Sake Brewery), Completely Design/Built, New sake process facility. Evaluation and review of plans, wrote specifications, estimated costs, solicited bids, negotiated contracts, scheduled and coordinated construction teams. Coordinated and managed, complete engineering and layout of office areas, plumbing, HVAC, electrical, fire protection and all brightwork. . Scheduled and coordinated process equipment hook-up and systems start-up.

BRIDGE, HIGHWAY & ROAD IMPROVEMENTS

Interstate Highway 55 Dwight, Pontiac, Bloomington, Illinois Apex Construction Company, Inc. - Superintendent New Interstate highway, includes complex highway interchanges, ten (10) bridges, roads, asphalt paving, and underground utilizes, drainage systems. Managed the project schedule and supervised the coordination of the construction teams. The project was completed on schedule. Managed the project schedule and supervised the coordination of the construction teams. The project was completed on schedule...
Road Improvements - City of Miami - PBS&J and HDR Engineering / Senior Project and Construction Manager Oversee Design and Construction of many road improvements throughout City of Miami. Which included potable water distribution systems, sewer rehabilitation and coordination of underground utilities. Projects involving paving, grading, drainage, lighting improvements sidewalks, surveying, permits and as build drawings. Wrote varieties technical and non-technical reports for Public Utilities and Public Works department.

HIGH RISE OFFICE COMPLEX

Pembroke One High Rise Office Building, Virginia Beach, Virginia - Terry Corporation - Construction Manager. Complete Design/Build; High-Rise 21-story tower office building, including structural, plumbing, electrical, fire protection and complete offices build-out. Reviewed, initial design and subsequent submittals. Scheduled construction teams, purchased and controlled inventory of project materials. Developed punch list and performed walk through during construction and at completion.

DISASTER CLEAN UP

Hurricane Charley Charlotte, Florida - (FEMA) Federal Emergency Management Agency Consultant
Hurricane Charley in October 2004 made land fall on the southwestern coast of Florida as a Category 4 hurricane. It caused catastrophic wind damage in Charlotte County, Florida area. Serious damage occurred well inland over the Florida peninsula. I work with (FEMA) Federal Emergency Management Agency to do search and rescue. Identified damage assessment of electrical power, food, water, shelter and other basic human needs. Also, coordinated with local, state, federal and volunteer organizations to determine losses and recovery needs; make rough estimates of the type of materials affected and the extent and nature of damage. Also, coordinated debris removal, temporary housing and technical assistance.
Hurricane Gabrielle - Venice Florida - (FEMA) Federal Emergency Management Agency Consultant Hurricane Gabrielle December 2001 (FEMA) Federal Emergency Management Agency. Gabrielle's center made landfall on Florida's west coast near Venice Florida. I work with (FEMA) Federal Emergency Management Agency to do search and rescue. Identified damage assessment of electrical power, food, water, shelter and other basic human needs. Also, coordinated with local, state, federal and volunteer organizations to determine losses and recovery needs; make rough estimates of the type of materials affected and the extent and nature of damage. Also, managed the coordinated of debris removal. Work with Federal Emergency Management Agency to supply temporary housing, and technical assistance.





Page Eight
SAMPLE PROJECT LIST
EDUCATIONAL

Norfolk State High Rise University - Norfolk, VA, - Terry Corporation/Apex Construction Construction Manager - Completely Design/Built, Several High Rise Facilities including: Lyman Beecher Brooks Library, L. Douglas Wilder Performing Arts Center, James A. Bowser Industrial Medicine Center, Babbette E. Smith Twin Towers, each 12-story (High Rise Dorms), William P. Robinson, Sr., Technology Center and parking deck.
University of South Florida -Tampa, Florida - Metric Constructors - Sr. Project Manager - Psychology and Communication Sciences Disorders Building - Completely Built, four-story New state-of the-art facility and comprises 118,000 square feet of classrooms, specialized laboratories, offices, meeting rooms, treatment facilities for psychology, communication sciences, and disorders department. In addition, the building contains an on-site preschool and an outdoor playground and circular garden.
University of South Florida -Tampa, Florida Construction Manager / Sr. Project Manager Infant and Child Development Center. Completely Design/Built, over 24,000 sq. ft., Renovation of complete building, including, new HVAC, plumbing, electrical, controls, fire protection, interior design of classroom space, office area, layout of lighting, wall and floor coverings, brightwork, fine finish hardwood trim/cabinetry, furnishings and parking lot, while the facility was in full operation.
Lansdale Elementary School, Norfolk, Virginia Construction Manager / Superintendent - Design/Built - Renovation of classrooms, office areas, complete kitchen and lunchroom. Including, new HVAC, plumbing, electrical, controls, fire protection, interior design of classrooms, office area, lighting, floor and wall coverings, brightwork, and hardwood trim/cabinetry and kitchen equipment.

STADIUM COMPLEX

Raymond James Stadium Tampa Florida - Metric Constructors - Sr. Project Manager / MEP Manager
The 134 acres known as Stadium Complex (formerly Tampa Stadium) & its parking lots. More than 65,000 seats designated general seating. Total capacity is 65,857 with 712 wheelchair-accessible seats. A total of 195 suites on two floors, at mid-level. Each suite has retractable glass windows, five televisions, private bar and restroom. Equipped with 88 restroom locations a total of 1,003 fixtures. With one fixture for every 61 people, restroom. Members of the NFL Players Association consistently rated the Stadiums field as the best in the league. The first regular season home game ever played at Raymond James Stadium the Bucs defeat the Chicago Bears, 27-15. Over seen field staff and resolved MEP issues.

RESORT

Sirata Beach Resort & Conference Center, Saint Petersburg Beach, FL. Metric Constructors - Sr. Project Manager Turnaround Project 12-acre, High-Rise, two 8-story towers, beachfront site on the Gulf Of Mexico, including new construction of two 8 story tower and 18,000 sq. ft. of flexible, state-of-the-art meeting/banquet space, 10 breakout rooms, of guest suites, renovation of an existing 8th floor banquet room with complete kitchen, and major interior and exterior building upgrades while the facility was in Full Operation and limited parking. Instructing personnel to operate and maintain equipment. Manager all MEP issues and field operations.
Loomis Trail Private Golf Country Club, Blaine, Washington Taikisha / TKS Industrial - Construction Manager. Complete Design/built, 4-story, hotel, restaurant and luxury condominiums, office area, parking lot, HVAC, plumbing, electrical, controls, exhaust, fire protection, interior and exterior design. Reviewed, initial design and subsequent submittals of subcontractors, vendor shop drawings and client alteration. Coordinated with all other disciplines to solicit bids and negotiate contracts.

PHARMACEUTICAL / BIOTECHNOLOGICAL

Wise Pharmaceutical & Research - Sunnyvale, CA. - Taikisha - Construction Manager - Complete Design/Built, Clean room, process equipment set and hook-up, mechanical & electrical, fire protection and systems controls. Office areas, all bright work, finish hardwood trim/cabinetry & furnishings. Scheduled construction teams, coordinated process equipment set / hook-up and systems start-up. Instructing new personnel to operate and maintain equipment.
R.P. Scherer Corporation/Cardinal Health Inc. - (Classified Project) - St. Petersburg, FL. - Consultant / Myself Pharmaceutical and Biotechnological Technologies, state-of the-art automated manufacturing systems, sterile liquid and injectible pharmaceuticals, Clean rooms, set and hook-up process equipment, and start up facility. Instructing new personnel to operate and maintain equipment. This included daily phasing and coordination to integrate with the existing systems. The facility was in full daily, 24-hour, 7-day week operations.




Page Seven
SAMPLE PROJECT LIST
HIGHTECHNOLOGY

Ultra Clean Technology, Inc., (Silicon Valley) Menlo Park, CA.-Taikisha - Construction Manager - Completely Design/Built, Ultra Clean Room Facility Class (0.1 Micron), D.I. Water generation and distribution, high purity gases, Nitrogen, Oxygen. Waste treatment, process vacuum, and instrument air, exhaust systems, fire protection. Including complete design/build and layout office of areas, mechanical, electrical, HVAC, plumbing, controls, interior design, lighting, flooring and wall covering, brightwork and furniture, etc. Dr. Tadahiro Ohmi, Professor, Physics Department, Tokyo University directed project, to realize the creation and construction of an ideal environment for the production of semiconductors (Most advanced cleanroom in the US as of 1992). Awarded in 1992 by Associated Clean Room Industry, Inc. for outstanding Design Engineering and Construction performance.
M.E.M.C. South West, Sherman, TX. - Fluor Daniel - Sr. Project Manager and Engineering Manager. Silicon Wafer 200 M.M. Facility. Engineering and complete Design/Build, 4-story Construction. Orchestrated construction and engineering for process tool hook-up. Facility included, crystal pulling, polishing, slicing, cleaning and cleanrooms Class 1 to 100,000, waste treatment. Scheduled and managed tool hook-up and ensured quality of installed process systems for ultrapure gasses, chemicals, water generation and distribution, life safety, and exhaust Process & General systems. Reviewed initial design and subsequent submittals of subcontractors, vendor shop drawings and client alterations to coordinate with all other disciplines for facility. Scheduled and coordinated process tool set, hook-up and systems start-up. Coordinated and managed, complete engineering and layout of office areas, plumbing, HVAC, electrical, fire protection and all brightwork. This was a Mega Project in the Southwestern part of the United States.
I.B.M., Essex Junction, Vermont - Fluor Daniel - Sr. Project Managed / Process & Specialty Project Manager - Managed fast-track, complete facility shutdown (first time in 16 years) for major mechanical upgrade of a silicon wafer facility. Liaison between I.B.M. managers, engineers, supervisors and contractors. Design and construction, 5-story, evaluation and review of plans, wrote specifications, estimated costs, solicited bids, negotiated contracts, scheduled and coordinated construction teams. Purchased, scheduled and controlled inventory of material and tool hook-up for ultrapure gasses, chemicals, water treatment, exhaust, chemical and gas dispensing rooms, ultrapure gas pads, and peripheral systems. Around the clock project completed on schedule and under budget. Awarded by I.B.M. for Outstanding Performance and Construction.
Lucent Technologies - Orlando, FL. - Metric Constructors - Sr. Project Manager - Bell Labs Innovations and Cirent Semiconductor, Technical Consultant /Sales Support.
Canon USA - (Silicon Valley) Santa Clara, CA Taikisha - Construction Manager - Completely Design/Build, clean room systems and set, hook up of all semiconductor equipment.
Dainippon Screen Inc. - Sunnyvale, CA. - Taikisha - Construction Manager - Completely Design/Built, Clean room, set and hook up process equipment.
Sony Display Device - Pittsburgh, PA. Taikisha - Construction Manager - Aperture Grille Plant, Completely Design/Built, Class 100 clean room, set and hook-up process equipment.
Kawasaki Wafer Technology, Inc. (M.E.M.C. Silicon Valley) Santa Clara, Ca. - Taikisha - Construction Manager. Engineer. Completely Design/Build, New state-of-the-art silicon wafer manufacturing plant. Class 10 (0.3 Micron) clean rooms, process equipment set and tool hook-up, HVAC systems, electrical, controls, process piping, fire protection, air and waste treatment, computer control room, and clean rooms. At the time this wafer plant was built, it was the first and only manufacturing wafer fab facility in the Silicon Valley.
White Oak Semiconductor Richmond, Virginia - Sr. Project Manager / Process & Specialty Project Manager.
New Wafer Fab and Support Buildings. Fast-track project schedule, called for the new DRAM wafer fab facility to be designed and built in exactly 12 months. Driving more than 18 miles of concrete piles for fab building alone. Working rate of 35 piles a day, the team sank 1,304 friction piles, 96,456 lineal feet in 37 days for the fab structure. Another 918 piles for three other associated buildings were driven same period. The project employed more than 1,400 construction workers, 60 subcontracting firms during peak construction. Is required to build four main structures simultaneously. In addition to the three-level fab, included building administration and common buildings, a probe/assembly/test building, and central utilities building. The probe/assembly/test, building house large cleanrooms, between Class 100 and Class 10,000. The fab structure was built with a combination of precast structural concrete and cast-in-place concrete to speed completion, significant cost-saving move. Divided the cleanrooms four-foot thick waffle deck, into two sections. One to meet more demanding vibration criteria for the photolithography area and one for less demanding criteria area. Mechanical piping large and complex, 54-inch diameter carbon steel and 42-inch diameter stainless steel pipes for condenser water. First phase, included installation of 17,410 tons of cooling capacity.
Menicon, USA - Clovis, PA. Taikisha - Construction Manager - Completely Design/Built, Clean room, HVAC, plumbing, electrical, fire protection.
Sony Magnetic Products, Inc. Japan -Taikisha - Construction Manager - Completely Design/Built, New (Class 100) Clean room.
Mitsubishi Material - Sunnyvale, CA. - Taikisha - Construction Manager - Completely Design/Built, Clean room, Class 1 (0.1 Micron) and process equipment set and hook-up.

Page Seven

SAMPLE PROJECT LIST
HEALTHCARE


DePaul Memorial Hospital - Portsmouth, VA. Terry Corporation/Apex Construction Construction Manager - Complete Design/Built, (retrofitting and updated equipment), Remodeling, 6-story, 102-Bed acute and general care areas, diagnostic imaging, radiology, magnetic resonance imaging (MRI), laboratory and pathology, respiratory care, EKG and EEG, cardiac catheterization lab areas. This also included all brightwork and fine finish hardwood trim/cabinetry and upgrades of mechanical, electrical, control networks and security controls systems within the facility. Included central plant chiller water system upgrades. Scheduled and coordinated self-perform construction teams. The facility was in full daily operations.
Valley Memorial Hospital - Livermore, CA. Taikisha - Sr. Project Manager - Completely Design/Built, New facility, comprised of two, 8-story state-of the-art medical facilities, 235-Bed acute with new state-of the-art medical office and ambulatory surgery center, as well as a medically based fitness facility. Include, Medical/Surgical, Telemetry, Critical Care, Surgical Services, Emergency, Maternal/Child, Pediatric, CathLab, Outpatient, Physical/Occupational Therapy, Geri/Psych and Urgent Care. Complete structural, civil, mechanical, plumbing, electrical, fire protection, computer control networks, central security centralized monitoring systems requirements. Included all brightwork and fine finish hardwood trim/cabinetry, and furnishings. Solicit bids, reviewed, initial design and subsequent submittals. Scheduled construction teams, oversaw and coordinator (MEP), Mechanical, Electrical, Plumbing, and purchased and controlled inventory of project materials.
Mather A.F.B. Hospital - Sacramento, CA. -Taikisha - Construction Manager / Design Engineer - (Classified Project). 3- story facility upgrades of mechanical, electrical, controls, computer network controls and complete security controls. Apart of the design team for systems and oversaw the installation and subsequent submittals of subcontractors, vendor shop drawings. Scheduled construction teams, purchased and controlled inventory of project materials. Facility was in full daily security operation.
Evergreen Healthcare Medical Center - San Jose, CA. Taikisha - Construction Manager - Completely Design/Built, New 93,000 square foot, two-story acute facility with 54 beds, four ORs, PT, labs, recovery rooms and six ICU rooms. Included all brightwork and fine finish hardwood trim/cabinetry, and control networks and security controls. Extensive site work and landscaping. Solicit bids, reviewed, initial design and subsequent submittals. Scheduled construction teams, oversaw and also, coordinator (MEP), Mechanical, Electrical, Plumbing, and purchased and controlled inventory of project materials.
Pacific Hills Manor - Morgan Hill, CA.- Taikisha - Construction Manager - (Nursing Home and Assisted Living Facility) - Completely Design/Build, New State-of-the-art, 99 bed and short and long term nursing facility. The new state-of the-art facility is in the form of an H. Each pod of the H is a separate unit, which includes, 4-nursing stations, 2 and 3 bedrooms with outside patios, medical specialty unit, therapy department, activities area, admissions and administration office area and maintenance facility. Complete structural, civil, mechanical, plumbing, electrical, fire protection, computer control networks, central security requirements and all brightwork and fine finish hardwood trim/cabinetry, and furnishings. Solicit bids, reviewed, initial design and subsequent submittals. Scheduled construction teams, oversaw and coordinator (MEP), Mechanical, Electrical, Plumbing, purchased and controlled inventory of project materials.
Doctors Hospital Of Sarasota Sarasota, FL. - Sr. Project Manager - (remodeling and updated equipment), 168-Bed acute and general care facility, emergency/chest pain center, surgery, intensive care and telemetry care units, magnetic resonance imaging (MRI), diagnostic imaging, radiology, inpatient and outpatient physical therapy. Laboratory and pathology, respiratory care, EEG and EKG, cardiac catheterization lab, electrophysiology lab, brightwork and fine finish hardwood trim/cabinetry, and furnishings. Coordinated with (AHCA), Agency For Healthcare Administration / State of Florida, to meet all required heath care codes and regulations. Awarded outstanding approves from the AHCA for meeting all heath care codes and regulations. Solicit bids, reviewed initial design to meet AHCA codes, regulations and subsequent submittals of subcontractors, vendor shop drawings. Facility was in full operation.

CHEMICAL PLANTS

Northern Petrochemical -Akzo Nobel- Morris, Illinois - Project & Construction Manager
Complete Design/Built. Removed and upgraded process piping, waste treatment system, electrical, controls systems and fire protection. The Morris Plant was the largest and most efficient fatty acid nitrogen derivatives plant in the world.








Page Seven
SAMPLE PROJECT LIST
AVIATION

Boeing / 777 Production and Assembly Plant -Everett, WA. - TKS Industrial - Construction Manager
Design/Built, New production and assembly plant facility for the Boeing 777. Boeing manufacturing plant, which is 11-stories tall, encloses 473 million cubic feet of space and covers more than 99 acres. The 26 cranes, 100 feet above, cruise on 35 miles of networked tracks and with over 1 million light fixtures. Includes five cafeterias, two cafes, 12 food plazas, medical clinic, fire department, day-care center, engineering and support activity office space. Listed by the Guinness Book of Records as the worlds largest building by volume.
Tampa International Airport -Tampa, Fl. Consultant /Senior Manager - Consultant to the City of Tampas Mayor Mr. Dick A. Greco and his staff. Also, worked with Tampa International Airport design team and the FFA. Complete Design and Construction of Airside Terminal-E. The State-of-the art terminal was built at a cost of $237 million.
O'Hare International Airport, Chicago, IL. Consultant / Senior Manger
Consultant to various airport terminal projects with Mayor Richard Daley, his staff and design team.
San Jose International Airport, San Jose, Ca. - Taikisha - Construction Manager - Airport Terminals C Intentional and C Domestic and Security Control Center. My responsibility to coordinates the design and construction of International Arrivals Facility, within terminal C. This area is inspection process area for International Arrivals. One-story 26,000 sq. ft. facility. Included , design and construction of Security Controls, Monitoring Systems, Voice/Data Communication, Patrol Service and Offices. In the main terminal Domestic C Domestic, is 160,000 sq. ft. and 15 gates. Included design, construction and renovation the Security, Monitoring, Communication/IT, Voice/Data communication systems, HVAC, Electrical Power, and Fire Protection. This entire work took place as the Airport stay in operation. This included daily phasing and coordination to integrate with the existing systems.
Tampa International Airport -Tampa, Fl. -Turnaround Project- Metric Constructors - Sr. Project Manager. Design/Built, Service Building (30,000 sq. ft., 2-story) including additional offices, security control and centralized monitoring systems. Complete renovation, gymnasium, restrooms, guard patrol and shipping/receiving docks.
US Army Aviation Support Facility - Brooksville, FL. - Metric Constructors - Sr. Project Manager - Blackhawk Helicopter Maintenance HangerTechnical Consultant / Sales Support.
Tampa International Airport -Tampa, Fl. - Mathews Construction Consultant/Senior Manager - Complete Design/Build, Service Building Expansion, Modifications and Related Work project, for the Hillsborough County Aviation Authority. Addition and 3-story interior renovation, which include complete Communication Center Study to move from first floor to second floor. Evaluation and review of plans, wrote specifications estimated costs, solicited bids, negotiated contracts, scheduled and coordinated construction teams.

AUTOMOTIVE

Honda Racing - Engine Testing Facilities (Classified Project), Santa Clara, CA. - Construction Manager - Complete Design/Built, mechanical, electrical, clean room environment, and controls.
Honda Motors, Honda Automobile Plant - Marysville, OH. - TKS Industrial - General Superintendent - Complete Design/Built, New Paint Systems.
Tomasco Automobile Parts Plant - Columbus, OH. -TKS Industrial - General Superintendent - Design/Built
New Paint, Waste Treatment and Conveyor Systems.
Diamond Star Motor Corp. /Mitsubishi - (Automotive), Normal, IL. General Superintendent - Conveyor, Robotic & Paint Systems.
Eagle Wings Industrial Inc.- Rantoul, IL - TKS Industrial / NKC Conveyor - General Superintendent - Parts Production Plant / Mitsubishi Conveyor, Robotic & Paint Systems, Process Piping.
Ford Motor Plant - Dearborn, MI. - Construction Manager - Conveyor, Robotic and Paint Systems,
Honda De Mexico - Guadalajara, Mexico - Construction Manager - Design/Build New automobile bumper line.
Chrysler Motors - Toluco, Mexico - Construction Manager - Paint system primer booth, conveyors, environmental equipment, waste treatment and HVAC systems.
Volkswagen - (Automobile Facility) - Pueblo, Mexico - Construction Manager - Design engineering, building, point system, conveyors, HVAC system, process piping, robotics, transfer devices and bumper line.
Subaru / Isuzu America - Lafayette, IN. General Superintendent - Conveyor, electrical, controls, paint system, piping.
Nissan Motor Manufacturing - USA (Trucks) - Smyrna, TN. Superintendent - Installation of plant robotics systems, electrical, and controls
Honda of America - (Automotive) - Marysville, OH. - TKS Industrial General Superintendent - Design/Built, new complete paint finishing system, waste treatment electrical, and controls.
Ford Motor Company Assembly Plant - (Truck) - Norfolk, Virginia - Durr Industries - Construction Manager -Installation new updated robotics, conveyor, prime, top coat, clear coat, waste treatment, paint booths, plant, air, electrical and controls, fire protection, structural, MCC panels, R.T.O. system, sludge pit, tank mist eliminators, and process piping. Evaluation and review of plans, negotiated contracts, scheduled and coordinated construction teams.

Page Seven
SAMPLE PROJECT LIST
MULTI-UNIT FAMILY

The Cloisters Condominiums - St. Petersburg, FL - Metric Constructors - Sr. Project Manager. Turnaround Project Completely Built, Mixed-Use High Rise, 18-story, on Saint Petersburg Bay, ultimate in luxury condominiums, spectacular views of Tampa Bay, Mediterranean style building, 1800 to over 4000 square feet and with 3-homes per floor, parking deck and retail shops on ground level. Located in the heart of Downtown, Saint Petersburg, Florida.
Paseo- Fort Myers, Florida Stock Development Vice President of Construction Engineering - This is over 461-acre, Master-planned mixed-use community, 749 Multi-family units & 368 Single Family Homes. Including The community centered around the Village Center which included a resort-style pool and over 4000-squrae foot gym, aerobics/p





A/E/C executives access six figure construction jobs (construction management jobs), architect jobs, civil engineering job and facility manager jobs. CE lists a variety of construction management positions, construction company jobs and construction vacancies, including civil engineering vacancies, construction engineering jobs, architecture jobs, facility management jobs, construction sales jobs, construction manager jobs, construction engineer jobs, environmental engineering jobs, chief estimator jobs, construction director jobs, president jobs, business development manager jobs, marketing director jobs, senior mechanical engineer jobs, senior electrical engineer jobs, chief engineer jobs, senior interior designer jobs, chief financial officer jobs, safety director jobs, senior structural engineer jobs, facilities director jobs, senior property manager jobs, diversity jobs and facilities management jobs.

Employers view interactive construction resumes, mechanical engineer resume or architect resumes, and research construction job descriptions, construction salaries or civil engineer salaries. Job seekers advance their construction management careers and secure construction manager employment, facilities management employment, and civil engineering employment.