Structural and reinforcing iron and metal workers place and install iron or steel girders, columns, and other construction materials to form buildings, bridges, and other structures. They also position and secure steel bars or mesh in concrete forms in order to reinforce the concrete used in highways, buildings, bridges, tunnels, and other structures. In addition, they repair and renovate older buildings and structures. Even though the primary metal involved in this work is steel, these workers often are known as ironworkers or erectors. Some ironworkers make structural metal in fabricating shops, which are usually located away from the construction site.

Before construction can begin, ironworkers must erect steel frames and assemble the cranes and derricks that move structural steel, reinforcing bars, buckets of concrete, lumber, and other materials and equipment around the construction site. Once this job has been completed, workers begin to connect steel columns, beams, and girders according to blueprints and instructions from supervisors and superintendents. Structural steel, reinforcing rods, and ornamental iron generally come to the construction site ready for erectioncut to the proper size, with holes drilled for bolts and numbered for assembly.

Ironworkers at the construction site unload and stack the prefabricated steel so that it can be hoisted easily when needed. To hoist the steel, ironworkers attach cables (slings) to the steel and to the crane or derrick. One worker directs the hoist operator with hand signals while another worker holds a rope (tag line) attached to the steel to prevent it from swinging. The crane or derrick hoists steel into place in the framework, whereupon two ironworkers called connectors position the steel with connecting bars and spud wrenchesa long wrench with a pointed handle. Workers using driftpins or the handle of a spud wrench align the holes in the steel with the holes in the framework. Ironworkers check vertical and horizontal alignment with plumb bobs, laser equipment, transits, or levels; then they bolt or weld the piece permanently in place.

Reinforcing iron and rebar workers, sometimes called rod busters, set reinforcing bars (often called rebar) in the forms that hold concrete, following blueprints showing the location, size, and number of bars. They then fasten the bars together by tying wire around them with pliers. When reinforcing floors, ironworkers place spacers under the rebar to hold the bars off the deck. Although these materials usually arrive ready to use, ironworkers occasionally must cut bars with metal shears or acetylene torches, bend them by hand or machine, or weld them with arc-welding equipment. Some concrete is reinforced with welded wire fabric that ironworkers put into position using hooked rods. Post-tensioning is another technique used to reinforce concrete. In this technique, workers substitute cables for rebar. When the concrete is poured, the ends of the cables are left exposed. After the concrete cures, ironworkers tighten the cables with jacking equipment specially designed for the purpose. Post-tensioning allows designers to create larger open areas in a building, because supports can be placed further apart. This technique is commonly employed in parking garages and arenas.

Ornamental ironworkers install stairs, handrails, curtain walls (the nonstructural walls and window frames of many large buildings), and other miscellaneous metal after the structure of the building has been completed. As they hoist pieces into position, ornamental ironworkers make sure that the pieces are properly fitted and aligned before bolting or welding them for a secure fit.


Answer: 1
Job Description Structural and reinforcing iron and metal workers place and install iron or steel girders, columns, and other construction materials to form buildings, bridges, and other structures. They also position and secure steel bars or mesh in concrete forms in order to reinforce the concrete used in highways, buildings, bridges, tunnels, and other structures. In addition, they repair and renovate older buildings and structures. Even though the primary metal involved in this work is steel, these workers often are known as ironworkers or erectors. Some ironworkers make structural metal in fabricating shops, which are usually located away from the construction site. Before construction can begin, ironworkers must erect steel frames and assemble the cranes and derricks that move structural steel, reinforcing bars, buckets of concrete, lumber, and other materials and equipment around the construction site. Once this job has been completed, workers begin to connect steel columns, beams, and girders according to blueprints and instructions from supervisors and superintendents. Structural steel, reinforcing rods, and ornamental iron generally come to the construction site ready for erectioncut to the proper size, with holes drilled for bolts and numbered for assembly. Ironworkers at the construction site unload and stack the prefabricated steel so that it can be hoisted easily when needed. To hoist the steel, ironworkers attach cables (slings) to the steel and to the crane or derrick. One worker directs the hoist operator with hand signals while another worker holds a rope (tag line) attached to the steel to prevent it from swinging. The crane or derrick hoists steel into place in the framework, whereupon two ironworkers called connectors position the steel with connecting bars and spud wrenchesa long wrench with a pointed handle. Workers using driftpins or the handle of a spud wrench align the holes in the steel with the holes in the framework. Ironworkers check vertical and horizontal alignment with plumb bobs, laser equipment, transits, or levels; then they bolt or weld the piece permanently in place. Reinforcing iron and rebar workers, sometimes called rod busters, set reinforcing bars (often called rebar) in the forms that hold concrete, following blueprints showing the location, size, and number of bars. They then fasten the bars together by tying wire around them with pliers. When reinforcing floors, ironworkers place spacers under the rebar to hold the bars off the deck. Although these materials usually arrive ready to use, ironworkers occasionally must cut bars with metal shears or acetylene torches, bend them by hand or machine, or weld them with arc-welding equipment. Some concrete is reinforced with welded wire fabric that ironworkers put into position using hooked rods. Post-tensioning is another technique used to reinforce concrete. In this technique, workers substitute cables for rebar. When the concrete is poured, the ends of the cables are left exposed. After the concrete cures, ironworkers tighten the cables with jacking equipment specially designed for the purpose. Post-tensioning allows designers to create larger open areas in a building, because supports can be placed further apart. This technique is commonly employed in parking garages and arenas. Ornamental ironworkers install stairs, handrails, curtain walls (the nonstructural walls and window frames of many large buildings), and other miscellaneous metal after the structure of the building has been completed. As they hoist pieces into position, ornamental ironworkers make sure that the pieces are properly fitted and aligned before bolting or welding them for a secure fit.





A/E/C executives access six figure construction jobs (construction management jobs), architect jobs, civil engineering job and facility manager jobs. CE lists a variety of construction management positions, construction company jobs and construction vacancies, including civil engineering vacancies, construction engineering jobs, architecture jobs, facility management jobs, construction sales jobs, construction manager jobs, construction engineer jobs, environmental engineering jobs, chief estimator jobs, construction director jobs, president jobs, business development manager jobs, marketing director jobs, senior mechanical engineer jobs, senior electrical engineer jobs, chief engineer jobs, senior interior designer jobs, chief financial officer jobs, safety director jobs, senior structural engineer jobs, facilities director jobs, senior property manager jobs, diversity jobs and facilities management jobs.

Employers view interactive construction resumes, mechanical engineer resume or architect resumes, and research construction job descriptions, construction salaries or civil engineer salaries. Job seekers advance their construction management careers and secure construction manager employment, facilities management employment, and civil engineering employment.